4.2.2 | Risk Management Result Form: Risk Management Process for Medical Electrical Equipment or Medical Electrical System
| |
YY/T 0316 article
| Risk Management Document References (Document and Paragraph Numbers) - The main heading of the article
| Results - Remarks
(What kind of objective evidence needs to be reflected in the cited documents)
| conclusion
|
| General program
| Special medical equipment
| | |
3.1 | Risk Management Report: Document No. QC/7.1-02A/0 & Chapter I, Section 5
| — | Risk management process (except production and post-production information)
| |
3.2 | Risk Management Report: Document No. QC/7.1-02A/0 & Chapter I, Section 4.2
| — | Adequate resources
| |
3.2 | Risk Management Report: Document No. QC/7.1-02A/0 & Chapter I, Section 3
| — | Assign qualified personnel
| |
3.2 | Risk Management Report: Document No. QC/7.1-02A/0 & Chapter II, Section 1.3
| — | Determine risk acceptance guidelines
| |
3.3 | — | Risk Management Report: Document No. QC/7.1-02A/0 & Chapter I, Section 3
| Personnel qualifications
| |
3.4a | — | Risk Management Report: Document No. QC/7.1-02A/0 & Chapter I, Section 4.1
| Risk management scope
| |
3.4b | — | Risk Management Report: Document No. QC/7.1-02A/0 & Chapter I, Section 3
| Assignment of responsibilities and authority
| |
3.4c | — | Risk Management Report: Document No. QC/7.1-02A/0 & Chapter I, Section 4.3
| Review requirements for risk management activities
| |
3.4d | — | Risk Management Report: Document No. QC/7.1-02A/0 & Chapter II, Section 1.3
| Risk Acceptance Criteria
| |
3.4e | — | Risk Management Report: Document No. QC/7.1-02A/0& Chapter III
| Verify the activity
| |
3.5 | — | Risk Management Report: Document No. QC/7.1-02A/0
| Risk management documentation
| |
4.1 | — | Risk Management Report: Document No. QC/7.1-02A/0 & Chapter II, Section 2
| Risk analysis process
| |
4.2 | — | Risk Management Report: Document No. QC/7.1-02A/0 & Chapter II, Section 2.2
| Identification of intended use and safety-related features
| |
4.3 | — | Risk Management Report: Document No. QC/7.1-02A/0 & Chapter II, Section 2.2
| Identification of hazards (sources).
| |
4.4 | — | Risk Management Report: Document No. QC/7.1-02A/0 & Chapter III, Section 1.1
| Estimate the risk of each hazardous situation
| |
5 | — | Risk Management Report: Document No. QC/7.1-02A/0 & Chapter III, Section 1.1
| Risk assessment
| |
6.2 | — | Risk Management Report: Document No. QC/7.1-02A/0 & Chapter III, Section 1.1
| Risk control scheme analysis
| |
6.3 | — | Risk Management Report: Document No. QC/7.1-02A/0 & Chapter II, Section 1.2
| Implementation of risk control measures
| |
6.4 | — | Risk Management Report: Document No. QC/7.1-02A/0 & Chapter IV
| Residual risk assessment
| |
6.5 | — | Risk Management Report: Document No. QC/7.1-02A/0 & Chapter V
| Risk/benefit analysis
| |
6.6a | — | — | The introduction of a new hazard (source) or hazardous situation
| |
6.6b | — | — | Whether the risk estimated by the previously identified hazardous situation has been affected by the introduction of risk control measures
| |
6.7 | — | Risk Management Report: Document No. QC/7.1-02A/0& Chapter VII
| Integrity of risk controls
| |
7 | — | Risk Management Report: Document No. QC/7.1-02A/0 & Chapter VII, Section 3
| Acceptability assessment of comprehensive residual risk
| |
8 | — | Risk Management Report: Document No. QC/7.1-02A/0
| Risk management reporting
| |
Additional Information: Risk document references should be based on relevant policy/procedure documents and include specific output files.
|