 Integrated energy for regional parks
REGIONAL INDUSTRIAL PARK
 School buildings
school bulLING
  •  Hotel Architecture
 Clean Energy for Agriculture, Forestry and Fisheries
 Shandong Penglai Innovation New District Heating, Cooling, Hot Water and Water Purification Integrated Project
 Fulfills a need: Heating, Cooling
 Heating area:
 Energy Method: Air Energy
 Unterminated form: Phoenix coil

Equipment size: 88 x 50 P air source heat source units


Operating hours: 230 days (140 days for heating, 90 days for cooling)

 Running Cost: $32
 Completion: July 2022 (Heating & Cooling)
 Hebei Langfang World's First City Energy Supply Project
 Fulfills a need.  Heating, cooling
 Heating area:
 Energy type.  air energy
 Unterminated form.  fan coil
 Equipment size:  32 x 50P air-source hot megawatt units
 Running time.  250 days (150 days for heating, 100 days for cooling)
 Running costs:  38 (Heating & Cooling)
 Completion.  August 2021
 Heating and Hot Water Project for Office and Accommodation Building of Cultural and Creative Park in Fengtai District, Beijing
 Fulfills a need: heating, hot water
 Energy method: air energy, gas
 End form: Heater

Plant Size: 2 x 400 kW Cold Susceptible Modular Furnaces +1 Air Pressurized Hot Water System

 Running time: 120 days
 Running Cost: $29.4
 Seepage time: February 2020

 Xi'an Origin New Town Redwood Furniture City Cold Shopping Center Project

 Fulfills a need: Heating, cooling, power generation
 Heating area:
 Energy method: air energy, solar energy
 End form: Combination air conditioner
 Equipment size: 18 sets of 50P ultra-low temperature air source heaters
 +3 sets of photovoltaic panels
 Running time: 120 days

Running Cost: $32 (combined heating and cooling; electricity $1.2 ) Dredging Time: Nov. 2021
 Tibet Zhongba County Solar Cross-Seasonal Thermal Storage and Heating Project
 Fulfills a need: Heating


Equipment Size: Large flat plate solar collector


+1.4 MW oil boiler +200 kW photovoltaic cells

 Running time: 240 days
 Running Cost: $17
 Completion: October 2019

 Hebei Nangong Libinjiayuan District Centralized Heating Project

 Fulfills a need: Heating
 Designed heating area:
 Actual paid area:
 Rate:

Reason for construction: Originally a geothermal well, closed due to environmental policy, in urgent need of renovation.

 Implementation model: Design, Supply, Construction, Operation and Maintenance (EPCO)
 Energy Method: Air Energy
 Equipment specification: 14䓵50P ultra-low temperature air source heat exchanger unit
 Equipment size: 14 sets of 50P low-temperature swamps
 Running time: 120 days
 Running Cost: $12.3

 Hebei Ningjin County Ink Courtyard Community
 Centralized Heating Project (Phase I)
 Fulfills a need: Exposure
 Heating area:
 Energy Method: Air Energy

Equipment size: 16 sets of 50 P ultra-low-temperature air-source mutual-execution units

 Running time: 120 days

 Running Costs.
 Completion: October 2020
 Tianjin Jinghai Dafengdui Village Centralized Heating Project
 Fulfills a need: Heating

Heating area: ( more than 1000 homes)

 Energy Method: Air Energy
 End form: Heater

Equipment Size: 40 units of 50 P ultra-low temperature air-source hot springs units

 Running time: 120 days

Running Cost: $15 (typical user)

 Completion: October 2018
 Beijing Miyun District Coal to Electricity Clean Heating Project
 Fulfills a need: Heating
 Heating area: more than 800 homes
 Energy Method: Air Energy
 End form . Heater

Service scope: 800 sets of 3, 5, 6P ultra-low temperature air source heat springs units


Running Cost: $18 (typical user)

 Completion: November 2022
 Beijing Yanqing Jingzhuang Township Rural Community Centralized Heating Project
 Fulfills a need: Heating
 Heating area:
 Source: Solar, Ground Source Heat Pumps
 End form: Underfloor heating coil
 Equipment size: 4 sets of pole-type geothermal heat exchanger units
  Flat plate solar collector crying
 Running time: 120 days
 (user-type)
 Acid work: September 2020

 Shandong Dezhou Wucheng Dier Middle School Heating Project

 Heating Project of Dahejia Middle School in Jieshishan County, Gansu Province
 Fulfills a need: gland harvesting
 Heating area:
 Energy Method: Air Energy
 Scale of reserve: 18 sets of 50P ultra-low-temperature air-source heat-spring units
 Running time: 120 days
 Running Cost: $11.12
 Dredging: January 2020
 Jiangsu Province Lianyungang City Jiefang Road Primary School Cooling and Heating Project
 Fulfills a need: Heating, cooling
 Heating area:
 Energy Method: Air Energy
 End form: Fan coil
 Equipment size: 2 sets of 50P ultra-low-temperature air-source thermal spring units

Running time: 150 days (Heating 90 days, Cooling 60 days Running cost: $26 (Completion date of combined cooling and heating: March 2021)
 Inter-seasonal Heating and Hot Water Project of Hebei University of Economics and Trade
 Fulfills a need: heating, hot water

Heating Area: ; Hot Water /

 Energy source: Solar
 Ends: Phoenix Coil

Equipment Size: Vacuum Tube Solar Collector

 Running time: 90 days
 Running Cost: $25
 Completion: May 2013
 Gansu Province Guanghe County No.2 Middle School Heating Project
 Fulfills a need: Heating
 Heating area:

 End form: Cast iron heater
 Equipment size: 13 sets of 50P ultra-low-temperature air-source thermal spring units
 Running time: 120 days
 Running costs . 15.2 dollars.
 Completion: October 2020
 Jiangsu Provincial People's Hospital Equipment Room Energy-saving Cooling Project
 Fulfills a need: Server room cooling
 Energy source: Thermal water springs
 Unterminated form: Fan Coil
 Equipment size: 2 sets of 50 kW water source heat ticket units
 Operating hours: All year round
 Cost of energy savings:
 Dredging Time: October 2019
 Beijing Jinhe Elderly Nursing Home Heating Project (Phase I and II)
 Fulfills a need: Heating
 Heating area:
 Energy Method: Air Energy
 End form: Underfloor heating搵管
 Equipment size: 16 sets of 25P ultra-low temperature air source heat excellence units
 Running time: 120 days
 Running Cost: $14
 Completion: October 2018

 8 Heating and Hot Water Project for Jinchuan County People's Hospital, Sichuan Province, Beijing
 Fulfills a need: heating, hot water
 Heating area:
 Energy method: Air energy, solar energy
 Ends: Phoenix Coil
 Equipment size: 322 A 10
 Equipment size: 32 units of 10P air-source thermal spring units
 +958m2 Vacuum Tube Solar Collectors
 Running time: 150 days
 Running costs: 25.17


Participation: 8 / 2017 (Electricity $1.1 )

 Effective Date: August 2017
 Ningxia Pengyang County Elderly Homes Coal to Electricity Clean Heating Project
 Fulfills a need: Heating
 Warming area:
 Source: Air, Solar, Electricity

 Equipment Size: 24 units of Air Source Heat Pump under Appearance
 11 high-temperature water source thermo-electric units
 Flat Plate Solar Collectors
 Running time: 150 days
 Running Cost: $25.4
 Effective Date: October 2020

 Heating and hot water project for the Sentinel Hotel in Qinghai

 Hebei Xingtai Ruiyue Hotel Cooling, Heating and Hot Water Project

 Fulfills a need: heating, cooling, hot water
 Heating area:
 Energy Method: Air Energy
 End form: Fan coil

Plant size: 14 x 130 kW air-cooled modular units.

 2 x 25P hot water heaters
 Operating hours: 210 days (heating 120 days, cooling 90 days)

Running Cost: $64 (Heating & Cooling) Completion: November 2021

 Fujian Xiamen Runlian Crowne Plaza Hotel Heating and Hot Water Project
 Fulfills a need: heating, hot water

Energy area: : Air + Gas Block Furnace

 Equipment specification: 12 sets of 30P air source heating units

 Running time: 60 days
 Running costs: $15 .
 Dredging: June 2021

 Enterprises and public institutions

 Hebei Xiongan Shoe Yard Heating and Cooling Project
 Fulfills a need: Heating, Cooling
 Heating area:
 Energy Method: Air Energy
 End form: Fan coil
 Equipment size: 14 sets of 20P ultra-low-temperature air-source thermal spring units
 Running time: 120 days

Running Cost: $32 (Heating & Cooling)

 Dredged: November 2016
 Henan Luoyang Luo Molybdenum Group Mining Company Clean Heat Supply Project
 Fulfills a need: Heating
 Heating area:
 Energy: Solar + Air + Valley Electricity Storage
 End form: Heater
 Equipment size: 5 sets of 25P ultra-low-temperature air-source thermal spring units
 + Vacuum Tube Solar Collectors

+160kw, 110kw induction heating equipment each set of running time: 120 days

 Running Cost: $27.13

(Original gas boiler heating operating cost: $43.06 )

 Effective Date: November 2019
 Heating and hot water project in Inner Mongolia Tuk service area
 Fulfills a need: heating, hot water
 Heating area:
 Energy Method: Air Energy
 End form . Heater

Equipment size: 2 screw-type ultra-low-temperature air-source heating units Equipment size: +45 sets of vacuum tube solar collector heaters

 Running time: 180 days
 Running Cost: $36
 Effective Date: December 2020
 Solar Cross-Seasonal Heating Project of Hebei Yimin Hardware Co.
 Tianjin Tianze Power Company Office Building Cooling and Heating Project
 Fulfills a need: Heating, cooling
 Heating area:
 Energy Method: Air Energy

End form: Factory air conditioning (jet) ten vertical open fan coiler


Service size: 29 units of 50 P air-source thermal spring units

 Completion: November 2021
 Ridong Shantou Longmen Dong greenhouse greenhouse thermostatic joint-supply project
 Fulfills a need: Heating, cooling
 Heating area:

 Unterminated form: 1 fan coil
 Equipment size: 12 units 50
 Running time: 120 days

Running costs: $1 . Days

 Completion: March 2019

 Ningxia Lund Meat Rabbit Meijin Heating Project

 Fulfills a need: Heating
 Heating area:
 Energy method: Solar + Air
 End form: Cast iron heater

Scope of preparation: flat plate solar collector +8 sets of ultra-low temperature air-source thermal spring unit

 Running time: 150 days
 Date of birth: October 2020

 Hunan Changde Sablefish Thermostatic Aquaculture Project

 Fulfills a need: Heating

Heating area: ; Total water volume: 77 m

 Energy Method: Air Energy
 Unterminated forms: nickel-free steel coils and fan coils
 Scope: 2 x 5P air source heaters
 Running time: 120 days
 Running Cost: $1.82 per pound of sablefish
 Completion: July 2019
 Jiangsu Lianyungang Dongfang Chicken Farm Clean Heating Project
 Fulfills a need: Heating
 Area of Full House Requirement:
 Heating area:
 Energy Method: Air Energy
 Kitchen: Radiator + Auxiliary Air Source Heaters
 When operating winterization: 12 Tables 5
 Operating hours: All year round
 Dredging: September 2020
 Tobacco Drying Project in Xiangcheng County, Xuchang City, Henan Province, China
 Fulfills a need: Tobacco drying
 Energy Method: Air Energy
 Equipment Size: Four Seasons Air Source Heat Pump Drying Unit
 Operating hours: All year round
 Running cost: 0.19 Yuan/kg water

  1.  Fulfills a need: Heating
     Heating area:
     Energy source: Solar,
     Ends: Phoenix Coil
     Unterminated form: 1 fan coil

    Equipment Size: 䆬 Air Tube Solar Collector + Ground Source Heaters
     Service size: 620 m points
     Running Cost: $12.50
     Completion: October 2015