GEORG precision cut 1650 xx6.35mm1650 \times 6.35 \mathrm{~mm} 65 " x . 25 " GEORG 精密切割 1650 xx6.35mm1650 \times 6.35 \mathrm{~mm} 65 " x . 25 "
Your advantages: 您的优势:
>> High precision cutting >> 高精度切割 >> Maximum productivity >> 最大生产力 >> Minimum maintenance effort >> 最小维护工作量 >> Excellent service and support - all around the world >> 优秀的服务和支持 - 遍布全球
mit uns technisch überlegen 与我们技术上更具优势
mit uns technisch überlegen| mit uns technisch überlegen |
| :--- | :--- |
瑞森特钢公司报价单
Quotation for
Ruisen Special Steel, Inc.
Quotation for
Ruisen Special Steel, Inc.| Quotation for |
| :---: |
| Ruisen Special Steel, Inc. |
23.09 .2024
Project 47703.01 项目 47703.01
1//331 / 33
"mit uns technisch überlegen" "Quotation for
Ruisen Special Steel, Inc."
23.09 .2024 Project 47703.01 1//33| mit uns technisch überlegen | Quotation for <br> Ruisen Special Steel, Inc. | | |
| :--- | :--- | :--- | :--- |
| | 23.09 .2024 | Project 47703.01 | $1 / 33$ |
mit uns technisch überlegen 与我们技术上更具优势
Heinrich Georg Maschinenfabrik - Langenauer Straße 12 - D-57223 Kreuztal 海因里希·乔治机械厂 - 兰根瑙尔街 12 号 - D-57223 克鲁伊茨塔尔
Ruisen Special Steel, Inc. 瑞森特种钢铁公司
Mrs Sophia Kline 索非亚·克莱因夫人
401 A Industrial Dr 401 A 工业大道
19454 North Wales PA 19454 北威尔士 PA
Dear Sophia, 亲爱的索非亚,
We thank you very much for your inquiry and have pleasure in enclosing our technical quotation for a 我们非常感谢您的询问,并很高兴附上我们的技术报价
GEORG precisioncut 1650 xx6.35mm1650 \times 6.35 \mathrm{~mm} GEORG 精密切割 1650 xx6.35mm1650 \times 6.35 \mathrm{~mm}
According to your specification we have checked our calculation and can offer the line up to strip thickness 6.35mm(0.250in)6.35 \mathrm{~mm}(0.250 \mathrm{in}) for Stainless Steel. 根据您的规格,我们已检查我们的计算,并可以提供不锈钢的条带厚度达到 6.35mm(0.250in)6.35 \mathrm{~mm}(0.250 \mathrm{in}) 。
With the GEORG precisioncut we offer you a new GEORG product which fully meets your requirements. Our highly automated line is based on a standard that has been developed for your individual needs, ensuring optimum processes. This new GEORG line offers minimized set-up times, few operating personnel, low energy and maintenance costs and highest safety requirements. 通过 GEORG 精密切割,我们为您提供了一款全新 GEORG 产品,完全满足您的需求。我们高度自动化的生产线基于为您的个性化需求开发的标准,确保最佳流程。这条新的 GEORG 生产线具有最小的设置时间、少量的操作人员、低能耗和维护成本以及最高的安全要求。
The line is based on standardized line units that have shown their capabilities. The complete configuration was prepared according to your needs. Therefor we can offer you an attractive solution in terms of price and performance. 该生产线基于已证明其能力的标准化线单位。完整的配置是根据您的需求准备的。因此,我们可以为您提供在价格和性能方面具有吸引力的解决方案。
Have we made you curious? Then feel free to arrange a meeting with our sales department to present and explain in detail our quotation. We are looking forward to your feedback. 我们让你感到好奇了吗?那么请随时安排与我们销售部门的会议,以详细介绍和解释我们的报价。我们期待您的反馈。
Best regards, 最诚挚的问候,
HEINRICH GEORG GMBH MASCHINENFABRIK 海因里希·乔治有限公司 机械制造厂
Tom Giebeler 汤·吉贝勒
Sales Manager Finishing Lines 销售经理完成线
Jochen Münker 乔亨·缪克
Vice President Sales & Technology North America 北美销售与技术副总裁
mit uns technisch überlegen 与我们技术上更具优势
Your individual Georg quotation no. 50122.01 您的个人乔治报价编号 50122.01
GEORG precisioncut 1650 xx6.351650 \times 6.35 mm GEORG 精密切割 1650 xx6.351650 \times 6.35 毫米
Commercial Quotation … 4 商业报价 … 4
Scope of Supply. … 5 供货范围。… 5
Options … 8 选项 … 8
Commercial Conditions … 9 商业条件 … 9
Explanations … 9 解释……9
Specification delimitations and remarks … 12 规范的界定和备注 … 12
Technical Quotation … 14 技术报价 … 14
Performances … 15 表演……15
Exclusion of delivery / Customer supply … 22 交付排除 / 客户供应 … 22
Georg Standard Components … 25 乔治标准组件 … 25
Attachments … 29 附件 … 29
mit uns technisch überlegen 与我们技术上更具优势
GEORG precisioncut 1650 xx6.35mm1650 \times 6.35 \mathrm{~mm} Commercial Quotation GEORG 精密切割 1650 xx6.35mm1650 \times 6.35 \mathrm{~mm} 商业报价
Scope of Supply 供应范围
The design of the line is according to the technical description and is similar to the enclosed drawing. All mentioned technical parameters should be understood as approximately values and can be adjusted if design and manufacturing changes are required. 该线路的设计符合技术说明,并与附图相似。所有提到的技术参数应理解为近似值,如需进行设计和制造更改,可以进行调整。
Pos. Unit 位置 单位
10 Coil turnstile 10 线圈旋转门
20 Coil car (L-type) 20 卷车(L 型)
30 Coil height centering 30 线圈高度中心定位
40 Outboard bearing 40 外部轴承
50 Decoiler 50 卷料机
55 Paper rewinder 55 纸卷重绕机
60 Strip centering control 60 条带中心控制
70 Infeed unit 70 进料单元
70.01 Infeed tables 70.01 进料台
70.02 Deflection and pinch roll unit 70.02 挡板和夹辊单元
70.03 Pre-straightening machine 70.03 预矫直机
70.04 Hydraulic cropping shear with pinch rolls 70.04 液压剪切机带夹辊
70.05 Motorized scrap car for one scrap box 70.05 一台废旧车用于一个废料箱
80 Carry-over table with reject gate 80 带拒绝门的传送带
120 Carry-over table 120 结转表
125 Fluid spraying device 125 液体喷射装置
130 High precision leveler RM 70 with levelling cassette CC 70 130 高精度平整机 RM 70,配平整盒 CC 70 130.012^("nd ")130.012^{\text {nd }} leveling cassette CC 65 130.012^("nd ")130.012^{\text {nd }} 调平盒 CC 65 130.023^("rd ")130.023^{\text {rd }} leveling cassette CC 50 130.023^("rd ")130.023^{\text {rd }} 调平盒 CC 50
130.03 Oscillating cleaning device 130.03 振荡清洗装置
140 Automatic leveling cassette change car 140 自动调平卡带更换车
150 Carry-over table with mirror system 150 带镜系统的结转表
mit uns technisch überlegen 与我们技术上更具优势
Pos. 位置。
Unit 单位
180
Eccentric shear unit 偏心剪切单元
180.01 Measuring wheel 180.01 测量轮
180.02 Pinch roll unit 180.02 压辊单元
180.03 Eccentric shear 180.03 偏心剪切
190
Two sectional run-out conveyor belt 两段式跑出输送带
195
Scrap carriage 废料车
200
Stacking unit - vacuum belt stacker 堆垛单元 - 真空带式堆垛机
210
Pallet feeding conveyors 托盘输送机
220
Lifting tables with roller conveyors underneath the stacker 带有滚筒输送机的升降台在堆垛机下方
230
Stack discharge roller conveyors 堆垛卸料辊输送机
260
Hydraulic and pneumatic equipment 液压和气动设备
270
Safety equipment 安全设备
280
Foundation equipment 基础设备
290
Electrical equipment 电气设备
300
Services 服务
300.01 Project management 300.01 项目管理
300.02 Design review meeting 300.02 设计评审会议
300.03 Training at GEORG/at customer side 300.03 在 GEORG/客户现场的培训
300.04 Ex-works inspection and pre-acceptance at GEORG 300.04 出厂检验和 GEORG 的预验收
300.05 安装、调试和操作人员培训的监督(不包括)
300.05 Supervision of installation, commissioning and instruction of the
operation personnel (NOT INCLUDED)
300.05 Supervision of installation, commissioning and instruction of the
operation personnel (NOT INCLUDED)| 300.05 Supervision of installation, commissioning and instruction of the |
| :--- |
| operation personnel (NOT INCLUDED) |
300.06 Final acceptance at customer's facility 300.06 客户设施的最终验收
300.07 Documentation 300.07 文档
300.08 Inspection procedure after warranty period 300.08 保修期后的检查程序
400
Tooling 工具制造
>>
1 set of tools for cropping shear (one upper and one lower knife) 一套修剪剪刀工具(一个上刀和一个下刀)
>>
1 set of tools for eccentric shear ( 1 set = one upper and one lower knife) 一套偏心剪刀工具(1 套=一把上刀和一把下刀)
Pos. Unit
180 Eccentric shear unit
180.01 Measuring wheel
180.02 Pinch roll unit
180.03 Eccentric shear
190 Two sectional run-out conveyor belt
195 Scrap carriage
200 Stacking unit - vacuum belt stacker
210 Pallet feeding conveyors
220 Lifting tables with roller conveyors underneath the stacker
230 Stack discharge roller conveyors
260 Hydraulic and pneumatic equipment
270 Safety equipment
280 Foundation equipment
290 Electrical equipment
300 Services
300.01 Project management
300.02 Design review meeting
300.03 Training at GEORG/at customer side
300.04 Ex-works inspection and pre-acceptance at GEORG
"300.05 Supervision of installation, commissioning and instruction of the
operation personnel (NOT INCLUDED)"
300.06 Final acceptance at customer's facility
300.07 Documentation
300.08 Inspection procedure after warranty period
400 Tooling
> 1 set of tools for cropping shear (one upper and one lower knife)
> 1 set of tools for eccentric shear ( 1 set = one upper and one lower knife)| Pos. | Unit |
| :---: | :---: |
| 180 | Eccentric shear unit |
| | 180.01 Measuring wheel |
| | 180.02 Pinch roll unit |
| | 180.03 Eccentric shear |
| 190 | Two sectional run-out conveyor belt |
| 195 | Scrap carriage |
| 200 | Stacking unit - vacuum belt stacker |
| 210 | Pallet feeding conveyors |
| 220 | Lifting tables with roller conveyors underneath the stacker |
| 230 | Stack discharge roller conveyors |
| 260 | Hydraulic and pneumatic equipment |
| 270 | Safety equipment |
| 280 | Foundation equipment |
| 290 | Electrical equipment |
| 300 | Services |
| | 300.01 Project management |
| | 300.02 Design review meeting |
| | 300.03 Training at GEORG/at customer side |
| | 300.04 Ex-works inspection and pre-acceptance at GEORG |
| | 300.05 Supervision of installation, commissioning and instruction of the <br> operation personnel (NOT INCLUDED) |
| | 300.06 Final acceptance at customer's facility |
| | 300.07 Documentation |
| | 300.08 Inspection procedure after warranty period |
| 400 | Tooling |
| $>$ | 1 set of tools for cropping shear (one upper and one lower knife) |
| $>$ | 1 set of tools for eccentric shear ( 1 set = one upper and one lower knife) |
GEORG 乔治
mit uns technisch überlegen 与我们技术上更具优势
Pos. Unit 位置 单位
Budget Price for 预算价格为
GEORG precisioncut 1650 xx6.35mm1650 \times 6.35 \mathrm{~mm} GEORG 精密切割 1650 xx6.35mm1650 \times 6.35 \mathrm{~mm}
EUR 8,600,000.00
65 “x .25”
(Pos 10-400)10-400)
(in Words: eight million sixhundred thousand EURO) 八百六十万欧元
Above mentioned price is based on GEORG standard design, using GEORG standard components as listed in Chapter Georg Standard Component. 上述价格基于 GEORG 标准设计,使用第 GEORG 标准组件章节中列出的 GEORG 标准组件。
Options 选项
The above mentioned optional prices are only valid in combination with the main offer. 上述提到的可选价格仅在与主报价结合时有效。
Commercial Conditions 商业条件
Explanations 解释
The commercial conditions hereafter are an integrated part of the quotation. 以下商业条款是报价的组成部分。
Price Basis: 价格基础:
The mentioned prices are to be understood FCA Heinrich Georg GmbH 提到的价格应理解为 FCA 海因里希·乔治有限公司
Maschinenfabrik, Kreuztal, Germany (as per INCOTERMS 2020) 机器制造厂,克鲁茨塔尔,德国(根据国际贸易术语解释通则 2020)
The parties can agree that the Seller shall ship the equipment DAP as 双方可以同意卖方应按 DAP 条款运输设备
per INCOTERMS 2020. 根据国际贸易术语解释通则 2020。
the seller will bill the Buyer at cost plus a 10% administrative handling 卖方将以成本加 10%的管理费用向买方开具账单
fee. Upon presentation of Seller's invoice associated with their DAP 费用。根据卖方与其 DAP 相关的发票出示。
obligations, the Buyer will issue a separate PO for the DAP based on 义务,买方将根据 DAP 发出单独的采购订单
actual costs at shipment plus 10%10 \% and pay the respective invoice in net 实际发货成本加上 10%10 \% ,并支付相应的净发票
30 days. 30 天。
The mentioned prices are to be understood FCA Heinrich Georg GmbH
Maschinenfabrik, Kreuztal, Germany (as per INCOTERMS 2020)
DAP - remark (optional price indication possible):
The parties can agree that the Seller shall ship the equipment DAP as
per INCOTERMS 2020.
the seller will bill the Buyer at cost plus a 10% administrative handling
fee. Upon presentation of Seller's invoice associated with their DAP
obligations, the Buyer will issue a separate PO for the DAP based on
actual costs at shipment plus 10% and pay the respective invoice in net
30 days.| The mentioned prices are to be understood FCA Heinrich Georg GmbH |
| :--- |
| Maschinenfabrik, Kreuztal, Germany (as per INCOTERMS 2020) |
| DAP - remark (optional price indication possible): |
| The parties can agree that the Seller shall ship the equipment DAP as |
| per INCOTERMS 2020. |
| the seller will bill the Buyer at cost plus a 10% administrative handling |
| fee. Upon presentation of Seller's invoice associated with their DAP |
| obligations, the Buyer will issue a separate PO for the DAP based on |
| actual costs at shipment plus $10 \%$ and pay the respective invoice in net |
| 30 days. |
30%30 \% after announcement of readiness for dispatch
10%10 \% after production start, latest 3 months after delivery
payable 30 days after invoice, net
30% down payment with the order
30% after half delivery time
30% after announcement of readiness for dispatch
10% after production start, latest 3 months after delivery
payable 30 days after invoice, net| $30 \%$ down payment with the order |
| :--- |
| $30 \%$ after half delivery time |
| $30 \%$ after announcement of readiness for dispatch |
| $10 \%$ after production start, latest 3 months after delivery |
| payable 30 days after invoice, net |
If relevant cost factors - such as costs of energy, raw materials, wages, 如果相关的成本因素——例如能源成本、原材料成本、工资,
insurance and transportation - increase substantially (i.e. by at least 10%) 保险和运输 - 大幅增加(即至少增加 10%)
during the time between Heinrich Georg's submission of an offer or 在海因里希·乔治提交报价的期间
confirmation of an order for which a fixed price is agreed and the date of 确认已达成固定价格的订单及日期
delivery, Heinrich Georg shall be entitled to increase the price by a 交付,海因里希·乔治有权提高价格
reasonable negotiated amount based on documentation; provided that (i) 根据文件合理协商的金额;前提是 (i)
in such calculation such price at date of offer or confirmation is adjusted 在此计算中,报价或确认日期的价格会进行调整
for the increase in the Producer Price Index over the same period and (ii) 在同一时期生产者价格指数的增加和(ii)
there is no delay with respect to the timeline for delivering the goods that 交付货物的时间表没有延迟
is not due to a force majeure event. Purchaser's interests shall be duly 不因不可抗力事件而导致。买方的利益应得到适当保障。
taken into account in this process, particularly with regard to possible 在这个过程中考虑到,特别是关于可能的
commitments of the Purchaser relating 买方相关的承诺
If relevant cost factors - such as costs of energy, raw materials, wages,
insurance and transportation - increase substantially (i.e. by at least 10%)
during the time between Heinrich Georg's submission of an offer or
confirmation of an order for which a fixed price is agreed and the date of
delivery, Heinrich Georg shall be entitled to increase the price by a
reasonable negotiated amount based on documentation; provided that (i)
in such calculation such price at date of offer or confirmation is adjusted
for the increase in the Producer Price Index over the same period and (ii)
there is no delay with respect to the timeline for delivering the goods that
is not due to a force majeure event. Purchaser's interests shall be duly
taken into account in this process, particularly with regard to possible
commitments of the Purchaser relating| If relevant cost factors - such as costs of energy, raw materials, wages, |
| :--- |
| insurance and transportation - increase substantially (i.e. by at least 10%) |
| during the time between Heinrich Georg's submission of an offer or |
| confirmation of an order for which a fixed price is agreed and the date of |
| delivery, Heinrich Georg shall be entitled to increase the price by a |
| reasonable negotiated amount based on documentation; provided that (i) |
| in such calculation such price at date of offer or confirmation is adjusted |
| for the increase in the Producer Price Index over the same period and (ii) |
| there is no delay with respect to the timeline for delivering the goods that |
| is not due to a force majeure event. Purchaser's interests shall be duly |
| taken into account in this process, particularly with regard to possible |
| commitments of the Purchaser relating |
Self-delivery clause: 自送条款:
If GEORG is unable to meet binding delivery deadlines for reasons for 如果 GEORG 因某种原因无法满足强制交货截止日期
which GEORG is not responsible for (non-availability of performance), 乔治不对此负责(无法履行)
GEORG will inform the customer of this without delay and at the same GEORG 将毫不延迟地通知客户这一点
time notify the customer of the expected new delivery deadline. 通知客户预期的新交货截止日期。
A case of non-availability of performance in this sense is deemed to be, 在这种意义上,无法履行的情况被视为,
in particular, the failure of a supplier (such as Siemens) to deliver on time 特别是,供应商(如西门子)未能按时交货的情况
if GEORG has entered into a congruent hedging transaction, neither 如果 GEORG 已经进行了一项一致的对冲交易,则两者都不
GEORG nor its supplier is at fault, or GEORG is not obliged to procure GEORG 或其供应商没有过错,或者 GEORG 没有义务进行采购
in the individual case. 在个别情况下。
If GEORG is unable to meet binding delivery deadlines for reasons for
which GEORG is not responsible for (non-availability of performance),
GEORG will inform the customer of this without delay and at the same
time notify the customer of the expected new delivery deadline.
A case of non-availability of performance in this sense is deemed to be,
in particular, the failure of a supplier (such as Siemens) to deliver on time
if GEORG has entered into a congruent hedging transaction, neither
GEORG nor its supplier is at fault, or GEORG is not obliged to procure
in the individual case.| If GEORG is unable to meet binding delivery deadlines for reasons for |
| :--- |
| which GEORG is not responsible for (non-availability of performance), |
| GEORG will inform the customer of this without delay and at the same |
| time notify the customer of the expected new delivery deadline. |
| A case of non-availability of performance in this sense is deemed to be, |
| in particular, the failure of a supplier (such as Siemens) to deliver on time |
| if GEORG has entered into a congruent hedging transaction, neither |
| GEORG nor its supplier is at fault, or GEORG is not obliged to procure |
| in the individual case. |
税务和关税备注:
Remark for Taxes and
Duties:
Remark for Taxes and
Duties:| Remark for Taxes and |
| :--- |
| Duties: |
所有税费、关税、费用及其他在德国以外的付款均由买方承担。
All taxes, customs duties, fees and other payments outside Germany are
to be borne by the buyer.
All taxes, customs duties, fees and other payments outside Germany are
to be borne by the buyer.| All taxes, customs duties, fees and other payments outside Germany are |
| :--- |
| to be borne by the buyer. |
Price Basis: "The mentioned prices are to be understood FCA Heinrich Georg GmbH
Maschinenfabrik, Kreuztal, Germany (as per INCOTERMS 2020)
DAP - remark (optional price indication possible):
The parties can agree that the Seller shall ship the equipment DAP as
per INCOTERMS 2020.
the seller will bill the Buyer at cost plus a 10% administrative handling
fee. Upon presentation of Seller's invoice associated with their DAP
obligations, the Buyer will issue a separate PO for the DAP based on
actual costs at shipment plus 10% and pay the respective invoice in net
30 days."
Terms of Payment: "30% down payment with the order
30% after half delivery time
30% after announcement of readiness for dispatch
10% after production start, latest 3 months after delivery
payable 30 days after invoice, net"
"Price adjustment
clause:" "If relevant cost factors - such as costs of energy, raw materials, wages,
insurance and transportation - increase substantially (i.e. by at least 10%)
during the time between Heinrich Georg's submission of an offer or
confirmation of an order for which a fixed price is agreed and the date of
delivery, Heinrich Georg shall be entitled to increase the price by a
reasonable negotiated amount based on documentation; provided that (i)
in such calculation such price at date of offer or confirmation is adjusted
for the increase in the Producer Price Index over the same period and (ii)
there is no delay with respect to the timeline for delivering the goods that
is not due to a force majeure event. Purchaser's interests shall be duly
taken into account in this process, particularly with regard to possible
commitments of the Purchaser relating"
Self-delivery clause: "If GEORG is unable to meet binding delivery deadlines for reasons for
which GEORG is not responsible for (non-availability of performance),
GEORG will inform the customer of this without delay and at the same
time notify the customer of the expected new delivery deadline.
A case of non-availability of performance in this sense is deemed to be,
in particular, the failure of a supplier (such as Siemens) to deliver on time
if GEORG has entered into a congruent hedging transaction, neither
GEORG nor its supplier is at fault, or GEORG is not obliged to procure
in the individual case."
"Remark for Taxes and
Duties:" "All taxes, customs duties, fees and other payments outside Germany are
to be borne by the buyer."| Price Basis: | The mentioned prices are to be understood FCA Heinrich Georg GmbH <br> Maschinenfabrik, Kreuztal, Germany (as per INCOTERMS 2020) <br> DAP - remark (optional price indication possible): <br> The parties can agree that the Seller shall ship the equipment DAP as <br> per INCOTERMS 2020. <br> the seller will bill the Buyer at cost plus a 10% administrative handling <br> fee. Upon presentation of Seller's invoice associated with their DAP <br> obligations, the Buyer will issue a separate PO for the DAP based on <br> actual costs at shipment plus $10 \%$ and pay the respective invoice in net <br> 30 days. |
| :---: | :---: |
| Terms of Payment: | $30 \%$ down payment with the order <br> $30 \%$ after half delivery time <br> $30 \%$ after announcement of readiness for dispatch <br> $10 \%$ after production start, latest 3 months after delivery <br> payable 30 days after invoice, net |
| Price adjustment <br> clause: | If relevant cost factors - such as costs of energy, raw materials, wages, <br> insurance and transportation - increase substantially (i.e. by at least 10%) <br> during the time between Heinrich Georg's submission of an offer or <br> confirmation of an order for which a fixed price is agreed and the date of <br> delivery, Heinrich Georg shall be entitled to increase the price by a <br> reasonable negotiated amount based on documentation; provided that (i) <br> in such calculation such price at date of offer or confirmation is adjusted <br> for the increase in the Producer Price Index over the same period and (ii) <br> there is no delay with respect to the timeline for delivering the goods that <br> is not due to a force majeure event. Purchaser's interests shall be duly <br> taken into account in this process, particularly with regard to possible <br> commitments of the Purchaser relating |
| Self-delivery clause: | If GEORG is unable to meet binding delivery deadlines for reasons for <br> which GEORG is not responsible for (non-availability of performance), <br> GEORG will inform the customer of this without delay and at the same <br> time notify the customer of the expected new delivery deadline. <br> A case of non-availability of performance in this sense is deemed to be, <br> in particular, the failure of a supplier (such as Siemens) to deliver on time <br> if GEORG has entered into a congruent hedging transaction, neither <br> GEORG nor its supplier is at fault, or GEORG is not obliged to procure <br> in the individual case. |
| Remark for Taxes and <br> Duties: | All taxes, customs duties, fees and other payments outside Germany are <br> to be borne by the buyer. |
approx. 20-24 months depending on the order placement and the
receipt of down payment as well as the availability of necessary
subcontractor items. In case of delay of down payment the actual delivery
time will be postponed and newly defined by the seller
approx. 20-24 months depending on the order placement and the
receipt of down payment as well as the availability of necessary
subcontractor items. In case of delay of down payment the actual delivery
time will be postponed and newly defined by the seller| approx. 20-24 months depending on the order placement and the |
| :--- |
| receipt of down payment as well as the availability of necessary |
| subcontractor items. In case of delay of down payment the actual delivery |
| time will be postponed and newly defined by the seller |
Warranty: 保修:
自投入使用后 12 个月,最迟在宣布准备发货后的 18 个月内,磨损和损耗部件除外。
12 months after commissioning, latest 18 months after announcement of
readiness for dispatch except wear and tear parts.
12 months after commissioning, latest 18 months after announcement of
readiness for dispatch except wear and tear parts.| 12 months after commissioning, latest 18 months after announcement of |
| :--- |
| readiness for dispatch except wear and tear parts. |
Should the seller fail to make delivery on time due to reasons the seller
is responsible for, the machine price shall be reduced by 0.3%0.3 \% per each
completed week of late delivery up to a maximum of 3%3 \%, provided that
such delay has actually caused damage to the Buyer. Beyond going
claims are expressly excluded. In case the installation, commissioning
and acceptance on site is delayed also due to reasons the customer is
responsible for, no liquidated damages can be paid by GEORG.
Should the seller fail to make delivery on time due to reasons the seller
is responsible for, the machine price shall be reduced by 0.3% per each
completed week of late delivery up to a maximum of 3%, provided that
such delay has actually caused damage to the Buyer. Beyond going
claims are expressly excluded. In case the installation, commissioning
and acceptance on site is delayed also due to reasons the customer is
responsible for, no liquidated damages can be paid by GEORG.| Should the seller fail to make delivery on time due to reasons the seller |
| :--- |
| is responsible for, the machine price shall be reduced by $0.3 \%$ per each |
| completed week of late delivery up to a maximum of $3 \%$, provided that |
| such delay has actually caused damage to the Buyer. Beyond going |
| claims are expressly excluded. In case the installation, commissioning |
| and acceptance on site is delayed also due to reasons the customer is |
| responsible for, no liquidated damages can be paid by GEORG. |
In no event - unless at intent or gross negligence - GEORG shall be
responsible for compensation of any consequential damages, e.g. loss
of production, loss of profit, capital cost etc.
In no event - unless at intent or gross negligence - GEORG shall be
responsible for compensation of any consequential damages, e.g. loss
of production, loss of profit, capital cost etc.| In no event - unless at intent or gross negligence - GEORG shall be |
| :--- |
| responsible for compensation of any consequential damages, e.g. loss |
| of production, loss of profit, capital cost etc. |
Conditions: 条件:
The general conditions ECE 188 A are to be applied. 一般条件 ECE 188 A 应予以适用。
Force Majeure: 不可抗力:
Force Majeure" means the occurrence of an event or circumstance that 不可抗力是指事件或情况的发生,
prevents a party from performing one or more of its obligations under the 阻止一方履行其在以下内容下的一个或多个义务
Contract if and to the extent that the party affected by the impediment 合同在受阻碍的一方受到影响的情况下
demonstrates that: 表明:
(a) such impediment is beyond its reasonable control; and (a) 这种障碍超出了其合理控制范围;并且
(b) it was not reasonably foreseeable at the time the contract was entered (b) 在签订合同时,无法合理预见
into; and 到; 和
(c) the effects of the impediment could not reasonably have been avoided (c) 障碍的影响本可以合理地避免
or overcome by the affected party. 或被受影响方克服。
During the period of force majeure the contractual obligations and rights 在不可抗力期间,合同义务和权利
shall be suspended. The party concerned shall inform the other party 应暂停。有关方应通知另一方。
without delay on the beginning and the cause of the delay and later on 没有延迟地开始和延迟的原因,以及后来的情况
the cessation thereof. 其终止。
Examples of force majeure include in particular: Acts of terrorist violence, 不可抗力的例子特别包括:恐怖主义暴力行为,
embargo, pandemic, epidemic, cyber attacks, war, riots, labor disputes, 禁运,疫情,流行病,网络攻击,战争,骚乱,劳动争议,
strikes, lockouts, official orders or measures, unforeseeable operational 罢工、停工、官方命令或措施、不可预见的操作
disruptions due to, for example, fire, water and hardware damage, and 由于火灾、水灾和硬件损坏等原因造成的中断,
any other hindrances which, when viewed objectively, are not culpably 任何其他障碍,从客观上看,并不是可责备的
caused by GEORG. 由 GEORG 引起。
If the force majeure lasts longer than six months, both parties shall reach 如果不可抗力持续超过六个月,双方应达成
a decision on the further performance of the contract. If the parties do not 对合同进一步履行的决定。如果各方不
reach an agreement, either party may appeal to the contractual 达成协议后,任何一方均可向合同方提出上诉
arbitration tribunal. 仲裁 tribunal.
Force Majeure" means the occurrence of an event or circumstance that
prevents a party from performing one or more of its obligations under the
Contract if and to the extent that the party affected by the impediment
demonstrates that:
(a) such impediment is beyond its reasonable control; and
(b) it was not reasonably foreseeable at the time the contract was entered
into; and
(c) the effects of the impediment could not reasonably have been avoided
or overcome by the affected party.
During the period of force majeure the contractual obligations and rights
shall be suspended. The party concerned shall inform the other party
without delay on the beginning and the cause of the delay and later on
the cessation thereof.
Examples of force majeure include in particular: Acts of terrorist violence,
embargo, pandemic, epidemic, cyber attacks, war, riots, labor disputes,
strikes, lockouts, official orders or measures, unforeseeable operational
disruptions due to, for example, fire, water and hardware damage, and
any other hindrances which, when viewed objectively, are not culpably
caused by GEORG.
If the force majeure lasts longer than six months, both parties shall reach
a decision on the further performance of the contract. If the parties do not
reach an agreement, either party may appeal to the contractual
arbitration tribunal.| Force Majeure" means the occurrence of an event or circumstance that |
| :--- |
| prevents a party from performing one or more of its obligations under the |
| Contract if and to the extent that the party affected by the impediment |
| demonstrates that: |
| (a) such impediment is beyond its reasonable control; and |
| (b) it was not reasonably foreseeable at the time the contract was entered |
| into; and |
| (c) the effects of the impediment could not reasonably have been avoided |
| or overcome by the affected party. |
| During the period of force majeure the contractual obligations and rights |
| shall be suspended. The party concerned shall inform the other party |
| without delay on the beginning and the cause of the delay and later on |
| the cessation thereof. |
| Examples of force majeure include in particular: Acts of terrorist violence, |
| embargo, pandemic, epidemic, cyber attacks, war, riots, labor disputes, |
| strikes, lockouts, official orders or measures, unforeseeable operational |
| disruptions due to, for example, fire, water and hardware damage, and |
| any other hindrances which, when viewed objectively, are not culpably |
| caused by GEORG. |
| If the force majeure lasts longer than six months, both parties shall reach |
| a decision on the further performance of the contract. If the parties do not |
| reach an agreement, either party may appeal to the contractual |
| arbitration tribunal. |
Transmission or reproduction of data provided to the customer to third
parties as well as using these data or its contents for purposes which are
not related to the cooperation with the Heinrich Georg GmbH is not
Transmission or reproduction of data provided to the customer to third
parties as well as using these data or its contents for purposes which are
not related to the cooperation with the Heinrich Georg GmbH is not| Transmission or reproduction of data provided to the customer to third |
| :--- |
| parties as well as using these data or its contents for purposes which are |
| not related to the cooperation with the Heinrich Georg GmbH is not |
Delivery Time: "approx. 20-24 months depending on the order placement and the
receipt of down payment as well as the availability of necessary
subcontractor items. In case of delay of down payment the actual delivery
time will be postponed and newly defined by the seller"
Warranty: "12 months after commissioning, latest 18 months after announcement of
readiness for dispatch except wear and tear parts."
Liquidated Damages: "Should the seller fail to make delivery on time due to reasons the seller
is responsible for, the machine price shall be reduced by 0.3% per each
completed week of late delivery up to a maximum of 3%, provided that
such delay has actually caused damage to the Buyer. Beyond going
claims are expressly excluded. In case the installation, commissioning
and acceptance on site is delayed also due to reasons the customer is
responsible for, no liquidated damages can be paid by GEORG."
Exclusion of Liability: "In no event - unless at intent or gross negligence - GEORG shall be
responsible for compensation of any consequential damages, e.g. loss
of production, loss of profit, capital cost etc."
Conditions: The general conditions ECE 188 A are to be applied.
Force Majeure: "Force Majeure" means the occurrence of an event or circumstance that
prevents a party from performing one or more of its obligations under the
Contract if and to the extent that the party affected by the impediment
demonstrates that:
(a) such impediment is beyond its reasonable control; and
(b) it was not reasonably foreseeable at the time the contract was entered
into; and
(c) the effects of the impediment could not reasonably have been avoided
or overcome by the affected party.
During the period of force majeure the contractual obligations and rights
shall be suspended. The party concerned shall inform the other party
without delay on the beginning and the cause of the delay and later on
the cessation thereof.
Examples of force majeure include in particular: Acts of terrorist violence,
embargo, pandemic, epidemic, cyber attacks, war, riots, labor disputes,
strikes, lockouts, official orders or measures, unforeseeable operational
disruptions due to, for example, fire, water and hardware damage, and
any other hindrances which, when viewed objectively, are not culpably
caused by GEORG.
If the force majeure lasts longer than six months, both parties shall reach
a decision on the further performance of the contract. If the parties do not
reach an agreement, either party may appeal to the contractual
arbitration tribunal."
Copyright: "Transmission or reproduction of data provided to the customer to third
parties as well as using these data or its contents for purposes which are
not related to the cooperation with the Heinrich Georg GmbH is not"| Delivery Time: | approx. 20-24 months depending on the order placement and the <br> receipt of down payment as well as the availability of necessary <br> subcontractor items. In case of delay of down payment the actual delivery <br> time will be postponed and newly defined by the seller |
| :---: | :---: |
| Warranty: | 12 months after commissioning, latest 18 months after announcement of <br> readiness for dispatch except wear and tear parts. |
| Liquidated Damages: | Should the seller fail to make delivery on time due to reasons the seller <br> is responsible for, the machine price shall be reduced by $0.3 \%$ per each <br> completed week of late delivery up to a maximum of $3 \%$, provided that <br> such delay has actually caused damage to the Buyer. Beyond going <br> claims are expressly excluded. In case the installation, commissioning <br> and acceptance on site is delayed also due to reasons the customer is <br> responsible for, no liquidated damages can be paid by GEORG. |
| Exclusion of Liability: | In no event - unless at intent or gross negligence - GEORG shall be <br> responsible for compensation of any consequential damages, e.g. loss <br> of production, loss of profit, capital cost etc. |
| Conditions: | The general conditions ECE 188 A are to be applied. |
| Force Majeure: | Force Majeure" means the occurrence of an event or circumstance that <br> prevents a party from performing one or more of its obligations under the <br> Contract if and to the extent that the party affected by the impediment <br> demonstrates that: <br> (a) such impediment is beyond its reasonable control; and <br> (b) it was not reasonably foreseeable at the time the contract was entered <br> into; and <br> (c) the effects of the impediment could not reasonably have been avoided <br> or overcome by the affected party. <br> During the period of force majeure the contractual obligations and rights <br> shall be suspended. The party concerned shall inform the other party <br> without delay on the beginning and the cause of the delay and later on <br> the cessation thereof. <br> Examples of force majeure include in particular: Acts of terrorist violence, <br> embargo, pandemic, epidemic, cyber attacks, war, riots, labor disputes, <br> strikes, lockouts, official orders or measures, unforeseeable operational <br> disruptions due to, for example, fire, water and hardware damage, and <br> any other hindrances which, when viewed objectively, are not culpably <br> caused by GEORG. <br> If the force majeure lasts longer than six months, both parties shall reach <br> a decision on the further performance of the contract. If the parties do not <br> reach an agreement, either party may appeal to the contractual <br> arbitration tribunal. |
| Copyright: | Transmission or reproduction of data provided to the customer to third <br> parties as well as using these data or its contents for purposes which are <br> not related to the cooperation with the Heinrich Georg GmbH is not |
allowed without prior written consent of the Heinrich Georg GmbH. The
Heinrich Georg GmbH expressively reserves the right to enforce a claim
for damages in cases of infringement. Any information and know-how
contained in the quotation are exclusive property of the Heinrich Georg
GmbH . The authority in this regard to register the intellectual property
right is exclusively reserved for the Heinrich Georg GmbH.
allowed without prior written consent of the Heinrich Georg GmbH. The
Heinrich Georg GmbH expressively reserves the right to enforce a claim
for damages in cases of infringement. Any information and know-how
contained in the quotation are exclusive property of the Heinrich Georg
GmbH . The authority in this regard to register the intellectual property
right is exclusively reserved for the Heinrich Georg GmbH.| allowed without prior written consent of the Heinrich Georg GmbH. The |
| :--- |
| Heinrich Georg GmbH expressively reserves the right to enforce a claim |
| for damages in cases of infringement. Any information and know-how |
| contained in the quotation are exclusive property of the Heinrich Georg |
| GmbH . The authority in this regard to register the intellectual property |
| right is exclusively reserved for the Heinrich Georg GmbH. |
The Seller is entitled to use media (e.g. photos and movies) taken from
the scope of supply at his premises for documentation, training and
marketing purposes. Media taken at the Buyer's premises are only used
with the Buyer's consent.
The Seller is entitled to use media (e.g. photos and movies) taken from
the scope of supply at his premises for documentation, training and
marketing purposes. Media taken at the Buyer's premises are only used
with the Buyer's consent.| The Seller is entitled to use media (e.g. photos and movies) taken from |
| :--- |
| the scope of supply at his premises for documentation, training and |
| marketing purposes. Media taken at the Buyer's premises are only used |
| with the Buyer's consent. |
Deutsche Bank AG
Siegen
IBAN: DE74 460700900020920500
SWIFT: DEUTDEDK460
UniCredit Bank AG
Köln
IBAN: DE19 370200900364606893
SWIFT: HYVEDEMM429
Commerzbank AG
Siegen
IBAN: DE43 460400330811112200
SWIFT: COBADEFF460
Sparkasse Siegen
Siegen
IBAN: DE31 460500010000064048
SWIFT: WELADED1SIE| Deutsche Bank AG |
| :--- |
| Siegen |
| IBAN: DE74 460700900020920500 |
| SWIFT: DEUTDEDK460 |
| UniCredit Bank AG |
| Köln |
| IBAN: DE19 370200900364606893 |
| SWIFT: HYVEDEMM429 |
| Commerzbank AG |
| Siegen |
| IBAN: DE43 460400330811112200 |
| SWIFT: COBADEFF460 |
| Sparkasse Siegen |
| Siegen |
| IBAN: DE31 460500010000064048 |
| SWIFT: WELADED1SIE |
公司信息:
Company
Information:
Company
Information:| Company |
| :--- |
| Information: |
首席执行官:马克·乔治 西根地方法院 HRB 2004 增值税识别号:DE 811183720
CEO: Mark Georg
Amtsgericht Siegen HRB 2004
Ust.-Id.-Nr.: DE 811183720
CEO: Mark Georg
Amtsgericht Siegen HRB 2004
Ust.-Id.-Nr.: DE 811183720| CEO: Mark Georg |
| :--- |
| Amtsgericht Siegen HRB 2004 |
| Ust.-Id.-Nr.: DE 811183720 |
Validity: 有效性:
由于目前原材料采购的交付和价格情况,我们此时只能保证报价有效期为 1 个月
Due to the current delivery and price situation in the procurement of raw
materials, we can only guarantee a quotation validity of 1 month at this
time
Due to the current delivery and price situation in the procurement of raw
materials, we can only guarantee a quotation validity of 1 month at this
time| Due to the current delivery and price situation in the procurement of raw |
| :--- |
| materials, we can only guarantee a quotation validity of 1 month at this |
| time |
The good supplied shall remain Georg's property until the total contract
price has been received by Georg.
In case of rescission, each party shall restore to the other party the
services already rendered. Any further claims are excluded.
The good supplied shall remain Georg's property until the total contract
price has been received by Georg.
In case of rescission, each party shall restore to the other party the
services already rendered. Any further claims are excluded.| The good supplied shall remain Georg's property until the total contract |
| :--- |
| price has been received by Georg. |
| In case of rescission, each party shall restore to the other party the |
| services already rendered. Any further claims are excluded. |
"allowed without prior written consent of the Heinrich Georg GmbH. The
Heinrich Georg GmbH expressively reserves the right to enforce a claim
for damages in cases of infringement. Any information and know-how
contained in the quotation are exclusive property of the Heinrich Georg
GmbH . The authority in this regard to register the intellectual property
right is exclusively reserved for the Heinrich Georg GmbH."
Image Right: "The Seller is entitled to use media (e.g. photos and movies) taken from
the scope of supply at his premises for documentation, training and
marketing purposes. Media taken at the Buyer's premises are only used
with the Buyer's consent."
Bank Details: "Deutsche Bank AG
Siegen
IBAN: DE74 460700900020920500
SWIFT: DEUTDEDK460
UniCredit Bank AG
Köln
IBAN: DE19 370200900364606893
SWIFT: HYVEDEMM429
Commerzbank AG
Siegen
IBAN: DE43 460400330811112200
SWIFT: COBADEFF460
Sparkasse Siegen
Siegen
IBAN: DE31 460500010000064048
SWIFT: WELADED1SIE"
"Company
Information:" "CEO: Mark Georg
Amtsgericht Siegen HRB 2004
Ust.-Id.-Nr.: DE 811183720"
Validity: "Due to the current delivery and price situation in the procurement of raw
materials, we can only guarantee a quotation validity of 1 month at this
time"
Miscellaneous: "The good supplied shall remain Georg's property until the total contract
price has been received by Georg.
In case of rescission, each party shall restore to the other party the
services already rendered. Any further claims are excluded."| | allowed without prior written consent of the Heinrich Georg GmbH. The <br> Heinrich Georg GmbH expressively reserves the right to enforce a claim <br> for damages in cases of infringement. Any information and know-how <br> contained in the quotation are exclusive property of the Heinrich Georg <br> GmbH . The authority in this regard to register the intellectual property <br> right is exclusively reserved for the Heinrich Georg GmbH. |
| :---: | :---: |
| Image Right: | The Seller is entitled to use media (e.g. photos and movies) taken from <br> the scope of supply at his premises for documentation, training and <br> marketing purposes. Media taken at the Buyer's premises are only used <br> with the Buyer's consent. |
| Bank Details: | Deutsche Bank AG <br> Siegen <br> IBAN: DE74 460700900020920500 <br> SWIFT: DEUTDEDK460 <br> UniCredit Bank AG <br> Köln <br> IBAN: DE19 370200900364606893 <br> SWIFT: HYVEDEMM429 <br> Commerzbank AG <br> Siegen <br> IBAN: DE43 460400330811112200 <br> SWIFT: COBADEFF460 <br> Sparkasse Siegen <br> Siegen <br> IBAN: DE31 460500010000064048 <br> SWIFT: WELADED1SIE |
| Company <br> Information: | CEO: Mark Georg <br> Amtsgericht Siegen HRB 2004 <br> Ust.-Id.-Nr.: DE 811183720 |
| Validity: | Due to the current delivery and price situation in the procurement of raw <br> materials, we can only guarantee a quotation validity of 1 month at this <br> time |
| Miscellaneous: | The good supplied shall remain Georg's property until the total contract <br> price has been received by Georg. <br> In case of rescission, each party shall restore to the other party the <br> services already rendered. Any further claims are excluded. |
mit uns technisch überlegen 与我们技术上更具优势
Specification delimitations and remarks 规范的界定和备注
In this offer, GEORG provides a highly automated system according to the latest technical GEORG standard. The offer is based on the proven solutions from the GEORG portfolio. 在此报价中,GEORG 提供了一套根据最新技术 GEORG 标准高度自动化的系统。该报价基于 GEORG 产品组合中的成熟解决方案。
All prices, information, performance data and warranty values given, always refer to this GEORG standard and are calculated and valid exclusively for this standard. The customer specification of the inquiry served as a basis for the preparation of the offer. In order to be able to offer a costoptimized solution, the offered machine partly deviates from the customer specification. The line design corresponds to the GEORG standard, the design takes into account at least all standards to achieve a certification according to CE. 所有给出的价格、信息、性能数据和保修值均参照此 GEORG 标准,并且仅针对该标准进行计算和有效。客户询价的规格作为报价准备的基础。为了能够提供成本优化的解决方案,所提供的机器在某些方面偏离了客户规格。生产线设计符合 GEORG 标准,设计至少考虑了所有标准,以实现 CE 认证。
Furthermore, the machine offered by GEORG complies with the currently valid Machinery Directive 2006/42/EC. Furthermore, the machine offered by GEORG complies with the Low Voltage Directive 2014/35/EU and the Electromagnetic Compatibility Directive 2014/30/EU. 此外,GEORG 提供的机器符合当前有效的机械指令 2006/42/EC。此外,GEORG 提供的机器符合低电压指令 2014/35/EU 和电磁兼容指令 2014/30/EU。
The component descriptions below very often aim at the functionality guaranteed by GEORG. Should descriptions of the technical design be unclear or open, the selection of the design is the responsibility of GEORG. 以下组件描述通常旨在说明 GEORG 所保证的功能。如果技术设计的描述不清晰或不明确,设计的选择由 GEORG 负责。
The delivery exclusions apply without restriction, any additional agreements will always be included in the offer or the final contract text. 交付排除适用不受限制,任何额外协议将始终包含在报价或最终合同文本中。
The standard components specified by GEORG are to be understood as a selection. The right is reserved to replace individual components with products from equivalent suppliers. GEORG 指定的标准组件应视为一种选择。保留更换个别组件为等效供应商产品的权利。
All pictures and drawings in the Technical Specification are only for illustration purposes! The final lay-out and actual configuration may deviate from the pictures used in this proposal. 技术规范中的所有图片和图纸仅用于说明目的!最终的布局和实际配置可能与本提案中使用的图片有所不同。
The Principal confirms with regards to the data required for this order that he is the entitled owner of all relevant information, documents, especially construction plans, drawings, sketches, lists of suppliers, list of material, etc. which will be necessary for execution of this order and are already or will be given to HEINRICH GEORG GMBH or is authorized by the entitled owner to forward information, to use - to deal with - to copy the documents and submit them to HEINRICH GEORG GMBH. Furthermore the Principal confirms that the result of work done by HEINRICH GEORG GMBH by using this information / documents will not violate neither the rights of third parties or rights of patent-, usage-, flavor- and/or copyrights and not depict an illegal replica of the product of a third party. 委托人确认,关于此订单所需的数据,他是所有相关信息、文件的合法拥有者,特别是施工计划、图纸、草图、供应商名单、材料清单等,这些信息将是执行此订单所必需的,并且已经或将会提供给 HEINRICH GEORG GMBH,或者被授权的拥有者可以转发信息、使用、处理、复制这些文件并提交给 HEINRICH GEORG GMBH。此外,委托人确认,HEINRICH GEORG GMBH 使用这些信息/文件所完成的工作成果不会侵犯第三方的权利或专利、使用、商标和/或版权的权利,也不会描绘第三方产品的非法复制品。
Export control: 出口管制:
(1) The conclusion and implementation of the Contract is subject to permissibility under applicable German and EU export control laws and regulations; this shall also apply to applicable US and other national laws and regulations in so far as this do not result in a violation or conflict with German or EU law. 合同的签订和实施须遵守适用的德国和欧盟出口管制法律法规;这也适用于适用的美国及其他国家的法律法规,只要这些法律法规不导致违反或与德国或欧盟法律发生冲突。
(2) The Parties shall mutually assist each other (“duty to cooperate”) in particular by providing all necessary information and documents in order to examine and comply with any legal restrictions regarding export controls (e.g. with regard to obtaining authorizations/information from authorities or 双方应相互协助(“合作义务”),特别是提供所有必要的信息和文件,以便审查和遵守有关出口管制的任何法律限制(例如,获取当局的授权/信息或
mit uns technisch überlegen 与我们技术上更具优势
fulfilling notification duties). The Buyer is obliged to inform the seller of an intended final destination outside of the European Union. 履行通知义务)。买方有义务告知卖方预定的最终目的地在欧盟以外。
(3) If the Seller has any doubts as to whether export control restrictions are relevant, he may require that a legally conclusive statement be obtained from the competent authority (e.g., “blank notice”). 如果卖方对出口管制限制是否相关有任何疑问,他可以要求从主管机关获得具有法律效力的声明(例如,“空白通知”)。
(4) If the transaction envisaged in the Contract is barred due to applicable export control restrictions, in particular because the issuance of necessary licenses is denied by the competent authorities, either Party is entitled to terminate the Contract in whole or in part by written notice to the other Party with immediate effect. The Seller is also entitled to terminate the Contract in whole or in part by written notice to the Buyer with immediate effect if the Buyer fails to provide the necessary information and documents within six weeks following the Seller’s request. In case of termination, the Seller has the right to claim compensation for the work carried out so far. Any damage claims of the Buyer against Seller arising out of or in connection with the termination of this Contract by the seller pursuant to this Clause shall be excluded. 如果合同中设想的交易因适用的出口管制限制而被禁止,特别是因为主管当局拒绝发放必要的许可证,任何一方都有权通过书面通知另一方立即终止合同的全部或部分。如果买方未能在卖方请求后的六周内提供必要的信息和文件,卖方也有权通过书面通知买方立即终止合同的全部或部分。在终止的情况下,卖方有权要求对迄今为止所进行工作的赔偿。因卖方根据本条款终止本合同而导致的买方对卖方的任何损害索赔均应被排除。
(5) The Seller may but is not obliged to challenge a formal decision of the competent authorities or take legal action in case of unduly lengthy duration of administrative proceedings. 卖方可以但不必对主管机关的正式决定提出异议或在行政程序持续时间过长的情况下采取法律行动。
(6) Any claims against the Seller based on delay or non-performance due to export control restrictions or the clarification of respective doubts are excluded except in the event of intent and gross negligence on behalf of the Seller. (6)因出口管制限制或对相关疑虑的澄清而导致的任何针对卖方的延迟或不履行的索赔均被排除,除非卖方存在故意或重大过失。
We trust that our quotation reflects your requirements and look forward to your response. In the meantime if you have any questions, please do not hesitate to contact us. 我们相信我们的报价符合您的要求,并期待您的回复。与此同时,如果您有任何问题,请随时与我们联系。
Best regards, 最诚挚的问候,
HEINRICH GEORG GMBH MASCHINENFABRIK 海因里希·乔治有限公司 机械制造厂
mit uns technisch überlegen 与我们技术上更具优势
GEORG precision cut 1650 xx6.35mm1650 \times 6.35 \mathrm{~mm} Technical Quotation GEORG 精密切割 1650 xx6.35mm1650 \times 6.35 \mathrm{~mm} 技术报价
mit uns technisch überlegen 与我们技术上更具优势
Performances 表演
Material data 材料数据
Material: 材料:
不锈钢、钢和铝,按照 DIN EN 9445 和 DIN EN 485
Stainless steel, steel and aluminium, according to DIN EN 9445
and DIN EN 485
Stainless steel, steel and aluminium, according to DIN EN 9445
and DIN EN 485| Stainless steel, steel and aluminium, according to DIN EN 9445 |
| :--- |
| and DIN EN 485 |
Sensitive surfaces e.g. mirror surface, bright annealed, grinding
quality is possible to process on the line. Highly sensitive
surfaces with no visual (and unmeasurable) defects on the
surface can be produced with the line as well.
Remark:
Sensitive surfaces e.g. mirror surface, bright annealed, grinding
quality is possible to process on the line. Highly sensitive
surfaces with no visual (and unmeasurable) defects on the
surface can be produced with the line as well.| Remark: |
| :--- |
| Sensitive surfaces e.g. mirror surface, bright annealed, grinding |
| quality is possible to process on the line. Highly sensitive |
| surfaces with no visual (and unmeasurable) defects on the |
| surface can be produced with the line as well. |
GEORG 系列不会在表面上造成任何可见的缺陷和划痕。
The GEORG line will not cause any visible defects and scratches
on the surface.
The GEORG line will not cause any visible defects and scratches
on the surface.| The GEORG line will not cause any visible defects and scratches |
| :--- |
| on the surface. |
对于该材料,需要一个干净的平整盒。GEORG 建议在平整机前使用喷涂装置,以确保高质量的产品。
For that material there needs to be one clean levelling cassette.
GEORG recommends using the spraying device in front of the
leveler for high quality product
For that material there needs to be one clean levelling cassette.
GEORG recommends using the spraying device in front of the
leveler for high quality product| For that material there needs to be one clean levelling cassette. |
| :--- |
| GEORG recommends using the spraying device in front of the |
| leveler for high quality product |
Protection paper: 保护纸:
在入口线圈的单个绕组之间有纸和没有纸
With and without paper in between the single windings on the
entry coils
With and without paper in between the single windings on the
entry coils| With and without paper in between the single windings on the |
| :--- |
| entry coils |
Remark: Possible yield limits are always depending on strip
thickness, strip width and quality of incoming material possible
(especially yield figures stronger than above mentioned limits)
Remark: Possible yield limits are always depending on strip
thickness, strip width and quality of incoming material possible
(especially yield figures stronger than above mentioned limits)| Remark: Possible yield limits are always depending on strip |
| :--- |
| thickness, strip width and quality of incoming material possible |
| (especially yield figures stronger than above mentioned limits) |
Elongation 延伸
10 - 50%
Material: "Stainless steel, steel and aluminium, according to DIN EN 9445
and DIN EN 485"
Typical metal grades:
Aluminum 3003, 3105, 5754, 3004
Stainless 201=1.4372; 304=1.4301;430=1.4016
All other materials need to be discussed
Surface: "Remark:
Sensitive surfaces e.g. mirror surface, bright annealed, grinding
quality is possible to process on the line. Highly sensitive
surfaces with no visual (and unmeasurable) defects on the
surface can be produced with the line as well."
"The GEORG line will not cause any visible defects and scratches
on the surface."
"For that material there needs to be one clean levelling cassette.
GEORG recommends using the spraying device in front of the
leveler for high quality product"
Protection paper: "With and without paper in between the single windings on the
entry coils"
Tensile strength R_(m) : Stainless Steel
Max. 145,038 psi 1000N//mm^(2)quad up to 2.5 mm
Max. 108,778 psi quad750N//mm^(2)quad up to 5.0 mm
Max. 87022 psi quad600N//mm^(2)quad up to 6.35 mm
Aluminum
max. 56,250 psi quad387N//mm^(2)
Yield limit R_(p0,2) : Stainless
Max. 65,000 psi 448N//mm^(2)
Aluminum
Max. 45,000 psi quad310 N/mm²
"Remark: Possible yield limits are always depending on strip
thickness, strip width and quality of incoming material possible
(especially yield figures stronger than above mentioned limits)"
Elongation 10 - 50%| Material: | Stainless steel, steel and aluminium, according to DIN EN 9445 <br> and DIN EN 485 |
| :---: | :---: |
| | Typical metal grades: |
| | Aluminum 3003, 3105, 5754, 3004 |
| | Stainless 201=1.4372; $304=1.4301 ; 430=1.4016$ |
| | All other materials need to be discussed |
| Surface: | Remark: <br> Sensitive surfaces e.g. mirror surface, bright annealed, grinding <br> quality is possible to process on the line. Highly sensitive <br> surfaces with no visual (and unmeasurable) defects on the <br> surface can be produced with the line as well. |
| | The GEORG line will not cause any visible defects and scratches <br> on the surface. |
| | For that material there needs to be one clean levelling cassette. <br> GEORG recommends using the spraying device in front of the <br> leveler for high quality product |
| Protection paper: | With and without paper in between the single windings on the <br> entry coils |
| Tensile strength $\mathbf{R}_{\mathrm{m}}$ : | Stainless Steel |
| | Max. 145,038 psi $1000 \mathrm{~N} / \mathrm{mm}^{2} \quad$ up to 2.5 mm |
| | Max. 108,778 psi $\quad 750 \mathrm{~N} / \mathrm{mm}^{2} \quad$ up to 5.0 mm |
| | Max. 87022 psi $\quad 600 \mathrm{~N} / \mathrm{mm}^{2} \quad$ up to 6.35 mm |
| | Aluminum |
| | max. 56,250 psi $\quad 387 \mathrm{~N} / \mathrm{mm}^{2}$ |
| Yield limit $\mathrm{R}_{\mathrm{p} 0,2}$ : | Stainless |
| | Max. 65,000 psi $448 \mathrm{~N} / \mathrm{mm}^{2}$ |
| | Aluminum |
| | Max. 45,000 psi $\quad 310$ N/mm² |
| | Remark: Possible yield limits are always depending on strip <br> thickness, strip width and quality of incoming material possible <br> (especially yield figures stronger than above mentioned limits) |
| Elongation | 10 - 50% |
Remark: According to the physically working principal the continuous working line units such as e.g. eccentric shear and leveler need a minimum speed higher than 0m//min0 \mathrm{~m} / \mathrm{min}. 备注:根据物理工作原理,连续工作线单元,例如偏心剪切机和整平机,需要的最低速度高于 0m//min0 \mathrm{~m} / \mathrm{min} 。
Leveling 平衡
Technical data of the leveler: 平整机的技术数据:
Type of leveler: 平整机类型:
RM 70/17/9-2.000
Design: 设计:
cassette change design 卡带更换设计
最大可能的平整辊直径:
Max. possible leveling roll
diameter:
Max. possible leveling roll
diameter:| Max. possible leveling roll |
| :--- |
| diameter: |
Type of leveler: RM 70/17/9-2.000
Design: cassette change design
"Max. possible leveling roll
diameter:" 70 mm
No. of support assemblies: 9
Pass line: approx. 1.200 mm
Free passage width: max. 1700 mm
Weight of leveller: approx. 36.000 kg (incl. change cassette CC70)| Type of leveler: | RM 70/17/9-2.000 |
| :--- | :--- |
| Design: | cassette change design |
| Max. possible leveling roll <br> diameter: | 70 mm |
| No. of support assemblies: | 9 |
| Pass line: | approx. 1.200 mm |
| Free passage width: | max. 1700 mm |
| Weight of leveller: | approx. 36.000 kg (incl. change cassette CC70) |
Technical data of the levelling roll change cassettes 平整辊更换盒的技术数据
No. of changing cassette: 更换盒数量:
1
2
3
mit uns technisch überlegen 与我们技术上更具优势
Cassette Type: 卡带类型:
CC 80
CC 65
CC 50
Levelling roll-ø: 平整辊-ø:
70 mm 70 毫米
65 mm 65 毫米
50 mm 50 毫米
Design: 设计:
6 high 6 高
6 high 6 高
6 high 6 高
Leveling range: 等级范围:
2.5-6.35mm2.5-6.35 \mathrm{~mm}
1.5-4.4mm1.5-4.4 \mathrm{~mm}
0.55-1.7mm0.55-1.7 \mathrm{~mm}
更换卡带的重量:
Weight of changing
cassette:
Weight of changing
cassette:| Weight of changing |
| :--- |
| cassette: |
Cassette Type: CC 80 CC 65 CC 50
Levelling roll-ø: 70 mm 65 mm 50 mm
Design: 6 high 6 high 6 high
Leveling range: 2.5-6.35mm 1.5-4.4mm 0.55-1.7mm
"Weight of changing
cassette:" approx. 8,000kg approx. 6,500kg approx. 4,500kg| Cassette Type: | CC 80 | CC 65 | CC 50 |
| :--- | :---: | :---: | :---: |
| Levelling roll-ø: | 70 mm | 65 mm | 50 mm |
| Design: | 6 high | 6 high | 6 high |
| Leveling range: | $2.5-6.35 \mathrm{~mm}$ | $1.5-4.4 \mathrm{~mm}$ | $0.55-1.7 \mathrm{~mm}$ |
| Weight of changing <br> cassette: | approx. $8,000 \mathrm{~kg}$ | approx. $6,500 \mathrm{~kg}$ | approx. $4,500 \mathrm{~kg}$ |
Tolerances 公差
Sheet flatness: 板材平整度:
for stainless steel according to the tolerance of DIN EN 9445-2 we 根据 DIN EN 9445-2 的公差,我们的不锈钢
guarantee 50%50 \% of the flatness tolerances for the levelling range 保证 50%50 \% 的平整度公差在水平范围内
mentioned in DIN EN 9445-2 for stainless steel. 在 DIN EN 9445-2 中提到的不锈钢。
for aluminum according to DIN EN 485-4 we guarantee 50% of 根据 DIN EN 485-4,我们对铝材保证 50%的
the flatness tolerances for the leveling range mentioned in DIN EN DIN EN 中提到的找平范围的平面度公差
485-4485-4 for aluminum. 485-4485-4 用于铝。
With the GEORG High Precision Leveler for aluminum according GEORG 高精度铝材平整机
to DIN EN 485 GEORG estimates the following results: 根据 DIN EN 485,GEORG 估计以下结果:
- flatness is improved by factor 7-107-10 depending on an - 平坦度提高了 7-107-10 倍,具体取决于一个
elongation between 10%-15%10 \%-15 \%10%-15%10 \%-15 \% 之间的延伸
- flatness is improved by factor 4-7 depending on an - 平整度提高了 4-7 倍,具体取决于一个
elongation between 5%-10%5 \%-10 \%5%-10%5 \%-10 \% 之间的延伸
- flatness is improved by factor 2-32-3 depending on an - 平坦度提高了 2-32-3 倍,具体取决于一个
elongation smaller 5% 伸长率小于 5%
(all aluminum tempers H18,H19\mathrm{H} 18, \mathrm{H} 19 and similar and strips with "self- (所有铝合金状态 H18,H19\mathrm{H} 18, \mathrm{H} 19 及类似的带材与“自-
hardening" effect, as well as tempers with elongation < 10%<10 \% are 硬化效应,以及与延伸 < 10%<10 \% 的调节
excluded from the above mentioned tolerances) 不包括在上述容忍度内)
for stainless steel according to the tolerance of DIN EN 9445-2 we
guarantee 50% of the flatness tolerances for the levelling range
mentioned in DIN EN 9445-2 for stainless steel.
for aluminum according to DIN EN 485-4 we guarantee 50% of
the flatness tolerances for the leveling range mentioned in DIN EN
485-4 for aluminum.
With the GEORG High Precision Leveler for aluminum according
to DIN EN 485 GEORG estimates the following results:
- flatness is improved by factor 7-10 depending on an
elongation between 10%-15%
- flatness is improved by factor 4-7 depending on an
elongation between 5%-10%
- flatness is improved by factor 2-3 depending on an
elongation smaller 5%
(all aluminum tempers H18,H19 and similar and strips with "self-
hardening" effect, as well as tempers with elongation < 10% are
excluded from the above mentioned tolerances)| for stainless steel according to the tolerance of DIN EN 9445-2 we |
| :--- |
| guarantee $50 \%$ of the flatness tolerances for the levelling range |
| mentioned in DIN EN 9445-2 for stainless steel. |
| for aluminum according to DIN EN 485-4 we guarantee 50% of |
| the flatness tolerances for the leveling range mentioned in DIN EN |
| $485-4$ for aluminum. |
| With the GEORG High Precision Leveler for aluminum according |
| to DIN EN 485 GEORG estimates the following results: |
| - flatness is improved by factor $7-10$ depending on an |
| elongation between $10 \%-15 \%$ |
| - flatness is improved by factor 4-7 depending on an |
| elongation between $5 \%-10 \%$ |
| - flatness is improved by factor $2-3$ depending on an |
| elongation smaller 5% |
| (all aluminum tempers $\mathrm{H} 18, \mathrm{H} 19$ and similar and strips with "self- |
| hardening" effect, as well as tempers with elongation $<10 \%$ are |
| excluded from the above mentioned tolerances) |
Sheet flatness: "for stainless steel according to the tolerance of DIN EN 9445-2 we
guarantee 50% of the flatness tolerances for the levelling range
mentioned in DIN EN 9445-2 for stainless steel.
for aluminum according to DIN EN 485-4 we guarantee 50% of
the flatness tolerances for the leveling range mentioned in DIN EN
485-4 for aluminum.
With the GEORG High Precision Leveler for aluminum according
to DIN EN 485 GEORG estimates the following results:
- flatness is improved by factor 7-10 depending on an
elongation between 10%-15%
- flatness is improved by factor 4-7 depending on an
elongation between 5%-10%
- flatness is improved by factor 2-3 depending on an
elongation smaller 5%
(all aluminum tempers H18,H19 and similar and strips with "self-
hardening" effect, as well as tempers with elongation < 10% are
excluded from the above mentioned tolerances)"| Sheet flatness: | for stainless steel according to the tolerance of DIN EN 9445-2 we <br> guarantee $50 \%$ of the flatness tolerances for the levelling range <br> mentioned in DIN EN 9445-2 for stainless steel. <br> for aluminum according to DIN EN 485-4 we guarantee 50% of <br> the flatness tolerances for the leveling range mentioned in DIN EN <br> $485-4$ for aluminum. <br> With the GEORG High Precision Leveler for aluminum according <br> to DIN EN 485 GEORG estimates the following results: <br> - flatness is improved by factor $7-10$ depending on an <br> elongation between $10 \%-15 \%$ <br> - flatness is improved by factor 4-7 depending on an <br> elongation between $5 \%-10 \%$ <br> - flatness is improved by factor $2-3$ depending on an <br> elongation smaller 5% <br> (all aluminum tempers $\mathrm{H} 18, \mathrm{H} 19$ and similar and strips with "self- <br> hardening" effect, as well as tempers with elongation $<10 \%$ are <br> excluded from the above mentioned tolerances) |
| :---: | :---: |
Cut-to-length shear performances 定尺剪切性能
mit uns technisch überlegen 与我们技术上更具优势
Shear type: 剪切型:
GEORG Eccentric Shear 乔治偏心剪切
Shear technology 剪切技术
Continuous 连续
Cutting length: 切割长度:
508-6000mm508-6000 \mathrm{~mm}
20 in -236 in 20 英寸 -236 英寸
(maximum length limited by the stacker 6,000 mm) (堆垛机最大长度限制为 6,000 毫米)
Cutting length tolerance: 切割长度公差:
Standard deviation as per DIN 55302 根据 DIN 55302 的标准偏差
Tolerances only valid for dry /non oiled material. The tolerance
consideration always refers to a constant line speed. The
accuracies in acceleration and deceleration phases may vary
slightly.
Tolerances only valid for dry /non oiled material. The tolerance
consideration always refers to a constant line speed. The
accuracies in acceleration and deceleration phases may vary
slightly.| Tolerances only valid for dry /non oiled material. The tolerance |
| :--- |
| consideration always refers to a constant line speed. The |
| accuracies in acceleration and deceleration phases may vary |
| slightly. |
+-0.4mm\pm 0.4 \mathrm{~mm}, for diagonal deviation for sheets of 600 mm width and
1,000mm1,000 \mathrm{~mm} length
+-0.4mm, for diagonal deviation for sheets of 600 mm width and
1,000mm length| $\pm 0.4 \mathrm{~mm}$, for diagonal deviation for sheets of 600 mm width and |
| :--- |
| $1,000 \mathrm{~mm}$ length |
+-0.7mm\pm 0.7 \mathrm{~mm}, for diagonal deviation for sheets of 600 mm width and
2,500 mm length
+-0.7mm, for diagonal deviation for sheets of 600 mm width and
2,500 mm length| $\pm 0.7 \mathrm{~mm}$, for diagonal deviation for sheets of 600 mm width and |
| :--- |
| 2,500 mm length |
Assuming that the strip has no tension and is free of twists 假设带子没有张力且没有扭曲
No of knives 刀具数量
2 (top and bottom knife) 2(上下刀)
Shear type: GEORG Eccentric Shear
Shear technology Continuous
Cutting length: 508-6000mm
20 in -236 in
(maximum length limited by the stacker 6,000 mm)
Cutting length tolerance: Standard deviation as per DIN 55302
S_(x)=+-0,2mm for sheet length < 1,000mm
S_(x)=+-0,25mm for sheet length > 1,001 < 2,000mm
S_(x)=+-0,35mm for sheet length > 2,001 < 3,000mm
S_(x)=+-0,4mm for sheet length > 3,001 < 4,000mm
S_(x)=+-0,45mm for sheet length > 4,001 < 5,000mm
S_(x)=+-0,5mm for sheet length > 5,001 < 6,000mm
"Tolerances only valid for dry /non oiled material. The tolerance
consideration always refers to a constant line speed. The
accuracies in acceleration and deceleration phases may vary
slightly."
Diagonal tolerance: "+-0.4mm, for diagonal deviation for sheets of 600 mm width and
1,000mm length"
"+-0.7mm, for diagonal deviation for sheets of 600 mm width and
2,500 mm length"
Assuming that the strip has no tension and is free of twists
No of knives 2 (top and bottom knife)| Shear type: | GEORG Eccentric Shear |
| :---: | :---: |
| Shear technology | Continuous |
| Cutting length: | $508-6000 \mathrm{~mm}$ |
| | 20 in -236 in |
| | (maximum length limited by the stacker 6,000 mm) |
| Cutting length tolerance: | Standard deviation as per DIN 55302 |
| | $S_{x}= \pm 0,2 \mathrm{~mm}$ for sheet length $<1,000 \mathrm{~mm}$ |
| | $S_{x}= \pm 0,25 \mathrm{~mm}$ for sheet length $>1,001<2,000 \mathrm{~mm}$ |
| | $S_{x}= \pm 0,35 \mathrm{~mm}$ for sheet length $>2,001<3,000 \mathrm{~mm}$ |
| | $S_{x}= \pm 0,4 \mathrm{~mm}$ for sheet length $>3,001<4,000 \mathrm{~mm}$ |
| | $S_{x}= \pm 0,45 \mathrm{~mm}$ for sheet length $>4,001<5,000 \mathrm{~mm}$ |
| | $S_{x}= \pm 0,5 \mathrm{~mm}$ for sheet length $>5,001<6,000 \mathrm{~mm}$ |
| | Tolerances only valid for dry /non oiled material. The tolerance <br> consideration always refers to a constant line speed. The <br> accuracies in acceleration and deceleration phases may vary <br> slightly. |
| Diagonal tolerance: | $\pm 0.4 \mathrm{~mm}$, for diagonal deviation for sheets of 600 mm width and <br> $1,000 \mathrm{~mm}$ length |
| | $\pm 0.7 \mathrm{~mm}$, for diagonal deviation for sheets of 600 mm width and <br> 2,500 mm length |
| | Assuming that the strip has no tension and is free of twists |
| No of knives | 2 (top and bottom knife) |
Cross beams on the bottom site, always mechanically fixed (e.g.
nailed), no loose beams. Foil or cardboard on top of the beams
fixed by glue or nailed (relevant for vacuum stacking systems)
Cross beams on the bottom site, always mechanically fixed (e.g.
nailed), no loose beams. Foil or cardboard on top of the beams
fixed by glue or nailed (relevant for vacuum stacking systems)| Cross beams on the bottom site, always mechanically fixed (e.g. |
| :--- |
| nailed), no loose beams. Foil or cardboard on top of the beams |
| fixed by glue or nailed (relevant for vacuum stacking systems) |
为了达到下面提到的堆叠精度,托盘的宽度和长度始终比板材尺寸小(约 5 毫米)。
To reach the below mentioned stacking accuracy the pallets are
always (approx. 5 mm ) smaller than the sheet dimension regarding
width and length.
To reach the below mentioned stacking accuracy the pallets are
always (approx. 5 mm ) smaller than the sheet dimension regarding
width and length.| To reach the below mentioned stacking accuracy the pallets are |
| :--- |
| always (approx. 5 mm ) smaller than the sheet dimension regarding |
| width and length. |
Stacking method: 堆叠方法:
With wooden, nailed or mechanically mounted pallets only 仅使用木制、钉合或机械安装的托盘
Stacking accuracy: 堆叠精度:
+-0,5mm\pm 0,5 \mathrm{~mm} up to 200 mm height +-0,5mm\pm 0,5 \mathrm{~mm} 高达 200 毫米
+-0,75mm\pm 0,75 \mathrm{~mm} up to 300 mm height +-0,75mm\pm 0,75 \mathrm{~mm} 高达 300 毫米
+-1,0mm\pm 1,0 \mathrm{~mm} up to 500 mm height +-1,0mm\pm 1,0 \mathrm{~mm} 高达 500 毫米
(Accurate pallets are assumed) (假设托盘准确)
Stacker Type: Vacuum belt stacker
Stacker Design: for continuous stacking of the cut sheets with two stacking positions
Stacking length: 1st stacking position: 381 xx3,000mm//15^('')xx118^('')- max. 13 feet
2nd stacking position: 381 xx3,000 mm / 15" x 118" - max 13 feet
Combined max. 6,000 mm / 236" / max. 26 feet
"For sheet length 381mm(15)-499mm(19.65)
- Min. sheet width 381mm(15^(''))
- Max. sheet width 1,030 mm (40")"
For sheet length 500 mm (19.68") - 6,000 mm (236")
"- Min. sheet width 381mm(15)
- Max. sheet width 1,650 mm (65")"
Stacking weight: "2xx5,000kg//1xx10,000kg
2xx10,000lb//1xx20,000lb"
Stacking height: max. 500 mm without pallet,
Pallet height: max. 600 mm with pallet,
Pallet height min. 130mm//max.200mm
Pallet design: "Cross beams on the bottom site, always mechanically fixed (e.g.
nailed), no loose beams. Foil or cardboard on top of the beams
fixed by glue or nailed (relevant for vacuum stacking systems)"
"To reach the below mentioned stacking accuracy the pallets are
always (approx. 5 mm ) smaller than the sheet dimension regarding
width and length."
Stacking method: With wooden, nailed or mechanically mounted pallets only
Stacking accuracy: +-0,5mm up to 200 mm height
+-0,75mm up to 300 mm height
+-1,0mm up to 500 mm height
(Accurate pallets are assumed)| Stacker Type: | Vacuum belt stacker |
| :---: | :---: |
| Stacker Design: | for continuous stacking of the cut sheets with two stacking positions |
| Stacking length: | 1st stacking position: $381 \times 3,000 \mathrm{~mm} / 15^{\prime \prime} \times 118^{\prime \prime}-$ max. 13 feet |
| | 2nd stacking position: $381 \times 3,000$ mm / 15" x 118" - max 13 feet |
| | Combined max. 6,000 mm / 236" / max. 26 feet |
| | For sheet length $381 \mathrm{~mm}(15 ")-499 \mathrm{~mm}(19.65 ")$ <br> - Min. sheet width $381 \mathrm{~mm}\left(15^{\prime \prime}\right)$ <br> - Max. sheet width 1,030 mm (40") |
| | For sheet length 500 mm (19.68") - 6,000 mm (236") |
| | - Min. sheet width $381 \mathrm{~mm}(15 ")$ <br> - Max. sheet width 1,650 mm (65") |
| Stacking weight: | $2 \times 5,000 \mathrm{~kg} / 1 \times 10,000 \mathrm{~kg}$ <br> $2 \times 10,000 \mathrm{lb} / 1 \times 20,000 \mathrm{lb}$ |
| Stacking height: | max. 500 mm without pallet, |
| Pallet height: | max. 600 mm with pallet, |
| | Pallet height min. $130 \mathrm{~mm} / \mathrm{max} .200 \mathrm{~mm}$ |
| Pallet design: | Cross beams on the bottom site, always mechanically fixed (e.g. <br> nailed), no loose beams. Foil or cardboard on top of the beams <br> fixed by glue or nailed (relevant for vacuum stacking systems) |
| | To reach the below mentioned stacking accuracy the pallets are <br> always (approx. 5 mm ) smaller than the sheet dimension regarding <br> width and length. |
| Stacking method: | With wooden, nailed or mechanically mounted pallets only |
| Stacking accuracy: | $\pm 0,5 \mathrm{~mm}$ up to 200 mm height |
| | $\pm 0,75 \mathrm{~mm}$ up to 300 mm height |
| | $\pm 1,0 \mathrm{~mm}$ up to 500 mm height |
| | (Accurate pallets are assumed) |
At the permanently manned workplaces of the line, a max. level of
max. 85-2 dB(A) in operation under load shall not be exceeded within
a distance of 1 m from the operator side to the line, except for impulse
noise, e.g. during the running through of the strip tail end or scrap
falling.
At the permanently manned workplaces of the line, a max. level of
max. 85-2 dB(A) in operation under load shall not be exceeded within
a distance of 1 m from the operator side to the line, except for impulse
noise, e.g. during the running through of the strip tail end or scrap
falling.| At the permanently manned workplaces of the line, a max. level of |
| :--- |
| max. 85-2 dB(A) in operation under load shall not be exceeded within |
| a distance of 1 m from the operator side to the line, except for impulse |
| noise, e.g. during the running through of the strip tail end or scrap |
| falling. |
max particle density 5-10mg//m^(3)5-10 \mathrm{mg} / \mathrm{m}^{3}
humidity of air
customer supply according to:
quality class 7:4:4 as per ISO 8573-1:2010
solids
particle size up to 10 mum
max particle density 5-10mg//m^(3)
humidity of air| customer supply according to: |
| :--- |
| quality class 7:4:4 as per ISO 8573-1:2010 |
| solids |
| particle size up to $10 \mu \mathrm{~m}$ |
| max particle density $5-10 \mathrm{mg} / \mathrm{m}^{3}$ |
| humidity of air |
压力凝结点高达 max+3^(@)C\max +3^{\circ} \mathrm{C} 温度
pressure condensation point up to max+3^(@)C\max +3^{\circ} \mathrm{C}
temperature
pressure condensation point up to max+3^(@)C
temperature| pressure condensation point up to $\max +3^{\circ} \mathrm{C}$ |
| :--- |
| temperature |
Approx. 4,000 NL/min at 6 bar pressure 约 4000 NL/分钟,压力为 6 巴
Ambient conditions: 环境条件:
Material flow: Left to right, looking from operation side of the line
Operation side: Right
Operation modes: "always in the line center
Decoiling from top and bottom"
Material passing height: approx. 1200 mm standard design of a line
Noise level: "At the permanently manned workplaces of the line, a max. level of
max. 85-2 dB(A) in operation under load shall not be exceeded within
a distance of 1 m from the operator side to the line, except for impulse
noise, e.g. during the running through of the strip tail end or scrap
falling."
Compressed air supply: "customer supply according to:
quality class 7:4:4 as per ISO 8573-1:2010
solids
particle size up to 10 mum
max particle density 5-10mg//m^(3)
humidity of air"
"pressure condensation point up to max+3^(@)C
temperature"
"min. approx. 10K > pressure condensation point, max50^(@)C
oil content"
"max. 0,5-5 oil drips //m^(3)
or max. 5mg//m^(3)"
Compressed air supply: Approx. 6 bar
Consumption: Approx. 4,000 NL/min at 6 bar pressure
Ambient conditions: | Material flow: | Left to right, looking from operation side of the line |
| :---: | :---: |
| Operation side: | Right |
| Operation modes: | always in the line center <br> Decoiling from top and bottom |
| Material passing height: | approx. 1200 mm standard design of a line |
| Noise level: | At the permanently manned workplaces of the line, a max. level of <br> max. 85-2 dB(A) in operation under load shall not be exceeded within <br> a distance of 1 m from the operator side to the line, except for impulse <br> noise, e.g. during the running through of the strip tail end or scrap <br> falling. |
| Compressed air supply: | customer supply according to: <br> quality class 7:4:4 as per ISO 8573-1:2010 <br> solids <br> particle size up to $10 \mu \mathrm{~m}$ <br> max particle density $5-10 \mathrm{mg} / \mathrm{m}^{3}$ <br> humidity of air |
| | pressure condensation point up to $\max +3^{\circ} \mathrm{C}$ <br> temperature |
| | min. approx. $10 \mathrm{~K}>$ pressure condensation point, $\max 50^{\circ} \mathrm{C}$ <br> oil content |
| | max. $0,5-5$ oil drips $/ \mathrm{m}^{3}$ <br> or max. $5 \mathrm{mg} / \mathrm{m}^{3}$ |
| Compressed air supply: | Approx. 6 bar |
| Consumption: | Approx. 4,000 NL/min at 6 bar pressure |
| Ambient conditions: | |