这是用户在 2024-8-27 10:18 为 https://jira.dell.com/secure/XrayTestPlanRepositoryAction!default.jspa?entityKey=GGT-93985&path=CCC2... 保存的双语快照页面,由 沉浸式翻译 提供双语支持。了解如何保存?
On September 6th at 5pm CT through September 9th at 3am CT, Dell Digital Jira will be unavailable for use.
DD JIRA Standardization FAQ
Test Plan Board /
  • TODO

FY25-1101-UATTestPlan

More
Switch to Flat View
  • All
    (293)
    • Orphans
      (129)
    • Board
      (164)
      • UAT0 (0)
      • CCC2 UAT -11010 (164)
        • MFG0 (0)
        • Material_Analyst20 (20)
        • Material_Handler0 (0)
        • Material_EP26 (26)
        • Warehouse0 (0)
        • SW_Test3 (3)
        • GCS24 (24)
        • Finance2 (2)
        • Quality82 (82)
        • Regulatory7 (7)
Board / CCC2 UAT -1101 / Regulatory
  • TODO
Showing 7 of 7 entries
GGT-98224Prepare order numbers for the testing
TODO
To Do
.
None
.
GGT-98225If product contains multipule PSU, all PSUs require Hi-pot/GND test
TODO
To Do
.
None
.
GGT-98226Check if orders with BIS info part, 3in1 label can print out with correct BIS logo and ID
TODO
To Do
.
None
.
GGT-98227Product type(BIS info) can be added/deleted/modified
TODO
To Do
.
None
.
GGT-98228Test one or more Hi-pot failure occur in multipule PSU product
TODO
To Do
.
None
.
GGT-98229All orders return to EMR will require Hi-pot/GND test again
TODO
To Do
.
None
.
GGT-98230Check to verify POD regulatory and CEL label maintenanace and printing functions are set correctly for Regulatory team
TODO
To Do
.
None
.
WalkMe