这是用户在 2025-1-12 13:16 为 https://app.immersivetranslate.com/pdf-pro/4cbfc82b-ec3a-48cb-a923-e387fa1d93fc 保存的双语快照页面,由 沉浸式翻译 提供双语支持。了解如何保存?
Fig. 8. A research framework for computational BIM application in building research, research gaps and future direction within the AECO industry.
见图8。建筑研究中计算BIM应用的研究框架,AECO行业内的研究差距和未来方向。
Visualization, Writing original draft, Writing - review & editing. Ziwen Liu: Formal analysis, Investigation, Methodology, Writing original draft, Writing - review & editing. Chukwuka Christian Ohueri: Data curation, Formal analysis, Writing - original draft, Writing - review & editing. Yaik-Wah Lim: Investigation, Writing - original draft, Writing - review & editing. Ahmad Fahmi Bin Zainazlan: Investigation, Writing - original draft, Writing - review & editing.
视觉化,撰写原始草稿,写作-审查和编辑.刘子文:形式分析,调查,方法论,撰写初稿,撰写-评论&编辑. Chukwuka Christian Ohueri:数据策展,形式分析,写作-原始草稿,写作-审查和编辑。Yaik-Wah Lim:调查,写作-原始草稿,写作-审查和编辑。Ahmad Fahmi Bin Zainazlan:调查,写作-原始草稿,写作-审查和编辑。

Declaration of competing interest
竞合利益声明

The authors declare that they have no known competing financial interests or personal relationships that could have appeared to influence the work reported in this paper.
作者声明,他们没有已知的可能影响本文所报告工作的竞争性经济利益或个人关系。

Appendix A  附录A

Citation  引文 CAD / BIM Tool  CAD / BIM工具 VP Tool  VP工具 Methodological role of VP-enabled computational BIM algorithms in building research
VP支持的计算BIM算法在建筑研究中的方法学作用
Revit Rhinoceros  犀牛 Other  其他 Dynamo  迪纳摩 Grasshopper Other  Grasshopper其他

数据 管理
Data
Management
Data Management| Data | | :--- | | Management |

过程 自动化
Process
Automation
Process Automation| Process | | :--- | | Automation |
Parametric modelling  参数化建模 Performance assessment and simulation
性能评估和模拟
Other  其他
[106]  [第一百零六章] - - -
[107]  [第一百零七话] - - -
[96]  [96个国家] - \bullet - -
[91]  [九十一] - - - -
[61]  [第六十一届] - - -
[62]  [六十二] - - -
[63]  [63个] - - -
[69]  [69]第六十九届 - - - - - -
[92]  [92个] - - - \bullet
[108]  [108]第一百零八话 - - -
[97]  [97个国家] - -8 - 20 - -
[98]  [98个国家] - - - -
[70]  [70个国家] - - -
[64]  [64个] - - \bullet -
[65]  [第六十五章] - - -
[99]  [九十九] - - -
[93]  [九三] - - - -
[100]  [100个项目] - - - -
(continued on  (续) t page)  t页)
Citation CAD / BIM Tool VP Tool Methodological role of VP-enabled computational BIM algorithms in building research Revit Rhinoceros Other Dynamo Grasshopper Other "Data Management" "Process Automation" Parametric modelling Performance assessment and simulation Other [106] - - - [107] - - - [96] - ∙ - - [91] - - - - [61] - - - [62] - - - [63] - - - [69] - - - - - - [92] - - - ∙ [108] - - - [97] - -8 - 20 - - [98] - - - - [70] - - - [64] - - ∙ - [65] - - - [99] - - - [93] - - - - [100] - - - - (continued on t page)| Citation | CAD / BIM Tool | | | VP Tool | | Methodological role of VP-enabled computational BIM algorithms in building research | | | | | | :---: | :---: | :---: | :---: | :---: | :---: | :---: | :---: | :---: | :---: | :---: | | | Revit | Rhinoceros | Other | Dynamo | Grasshopper Other | Data <br> Management | Process <br> Automation | Parametric modelling | Performance assessment and simulation | Other | | [106] | - | | | - | | - | | | | | | [107] | - | | | - | | | - | | | | | [96] | - | | | $\bullet$ | | | - | - | | | | [91] | | - | | | - | - | | - | | | | [61] | - | | | | - | | | | - | | | [62] | - | | | - | | - | | | | | | [63] | - | | | | - | | | | - | | | [69] | - | - | - | - | | - | | - | | | | [92] | - | - | | | - | | $\bullet$ | | | | | [108] | - | | | - | | | - | | | | | [97] | - | -8 | | - | 20 | - | | | | - | | [98] | - | | | - | | - | | | | - | | [70] | - | | | | - | | | | | - | | [64] | - | - | | $\bullet$ | | | | | - | | | [65] | - | | | - | | | | | - | | | [99] | - | | | - | | | | | | - | | [93] | - | | | - | | - | | - | | | | [100] | - | | | - | | - | | | | - | | | | | | | | | | | (continued on | t page) |
(continued)  (续)
Citation  引文 CAD/BIM Tool  CAD/BIM工具 VP Tool  VP工具 Methodological role of VP-enabled computational BIM algorithms in building research
VP支持的计算BIM算法在建筑研究中的方法学作用
Revit Rhinoceros  犀牛 Other  其他 Dynamo  迪纳摩 Grasshopper  蚱蜢 Other  其他

数据 管理
Data
Management
Data Management| Data | | :--- | | Management |

过程 自动化
Process
Automation
Process Automation| Process | | :--- | | Automation |
Parametric modelling  参数化建模 Performance assessment and simulation
性能评估和模拟
Other  其他
[109]  [109]第一百零九话 \bullet
[71]  [第七十一届]
[47]  [47]
[48]  [48] \bullet
[72]  [72]
[84]  [84] \bullet
[110]  [110] 0 8 0 8 0^(8)0^{8} 0 0 -0^(@)-0^{\circ}
[45] \bullet 人淄
[49] \bullet
[77]
[85]
[86]  [86]
[73]  [73]
[87]  [87]
[50]  [50]
[74]  [74]
[43]  [43]
[75]  [七十五] \bullet
[101]  [一百零一]
[111]  [111]
[112]  [一百一十二]
[78] [94]  [78][94] \bullet \bullet
\bullet \bullet
\bullet
\bullet
[44]  [44] \bullet
[42]  [四十二] \bullet \bullet \bullet
[39]  [三十九]
[76]  [七十六] \bullet \bullet
[40]  [40] \bullet
[6]  [6]
[52]  [52]
[53]  [53] \bullet
[46]  [四十六]
[9]  [9]
[8]  [8]
[41]  [41]
[80]  [80] \bullet \bullet
[81]
[82]  [82]
[95]  [95]
[54]  [54]
[88]  [88]
[19]  [19]
[55]  [55]
[56]  [56]
[102]  [102] \bullet
[113]  [113]
[66]  [六十六]
[104]  [104]
[67]  [六十七] , \bullet Q
[57]  [57]
0 0 00 \bullet
[58]  [58]
[105]  [105] \bullet
[89]  [89]
[103]  [103] \bullet
[83]  [83] \bullet
[90]  [90] \bullet
[59]  [59] \bullet
[68]  [68个]
[60]  [60个]第二章
67 16 11 60 18 4 42 16 16 24 9
Citation CAD/BIM Tool VP Tool Methodological role of VP-enabled computational BIM algorithms in building research Revit Rhinoceros Other Dynamo Grasshopper Other "Data Management" "Process Automation" Parametric modelling Performance assessment and simulation Other [109] ∙ - - [71] - - - - - - [47] - - - - [48] - ∙ - [72] - - - - - [84] - - - ∙ - [110] - - 0^(8) - - - - -0^(@) [45] - - ∙ - 人淄 [49] - ∙ - [77] - - - [85] - - - - - - [86] - - - - [73] - - - - [87] - - - - [50] - - - - [74] - - - [43] - - - - [75] - - ∙ - [101] - - - - [111] - - - - [112] - [78] [94] - 俉 - ∙ ∙ https://cdn.mathpix.com/cropped/2025_01_12_16082c99ea41429dc8e8g-2.jpg?height=50&width=244&top_left_y=974&top_left_x=1555 https://cdn.mathpix.com/cropped/2025_01_12_16082c99ea41429dc8e8g-2.jpg?height=35&width=51&top_left_y=1013&top_left_x=144 ∙ ∙ https://cdn.mathpix.com/cropped/2025_01_12_16082c99ea41429dc8e8g-2.jpg?height=35&width=114&top_left_y=1013&top_left_x=1163 ∙ - ∙ - - - [44] - - ∙ - [42] ∙ ∙ ∙ [39] - - - [76] - ∙ ∙ [40] - - - ∙ [6] - - - [52] - - - [53] - - ∙ - [46] - - - [9] - - - - - [8] - - - [41] - - - [80] - 人 - ∙ ∙ [81] - - - - [82] - - - - [95] - - - [54] - - - - [88] - - - [19] - - - - [55] - - - [56] - - - [102] - - ∙ [113] - - - [66] - - - - [104] - - - [67] - - , ∙ Q [57] - https://cdn.mathpix.com/cropped/2025_01_12_16082c99ea41429dc8e8g-2.jpg?height=36&width=78&top_left_y=1863&top_left_x=402 - 0 ∙ https://cdn.mathpix.com/cropped/2025_01_12_16082c99ea41429dc8e8g-2.jpg?height=36&width=63&top_left_y=1863&top_left_x=1736 [58] - - - [105] ∙ - - [89] - - - [103] - ∙ [83] - ∙ - [90] - - ∙ [59] - ∙ - [68] - - - [60] - - - 67 16 11 60 18 4 42 16 16 24 9| Citation | CAD/BIM Tool | | | VP Tool | | | Methodological role of VP-enabled computational BIM algorithms in building research | | | | | | :---: | :---: | :---: | :---: | :---: | :---: | :---: | :---: | :---: | :---: | :---: | :---: | | | Revit | Rhinoceros | Other | Dynamo | Grasshopper | Other | Data <br> Management | Process <br> Automation | Parametric modelling | Performance assessment and simulation | Other | | [109] | $\bullet$ | | | - | | | - | | | | | | [71] | - | - | - | - | - | | | | - | | | | [47] | - | | | - | | | - | | | - | | | [48] | - | | | $\bullet$ | | | - | | | | | | [72] | | - | - | | - | | | - | - | | | | [84] | - | | | - | | | | - | $\bullet$ | - | | | [110] | - | - $0^{8}$ | | - | - | | - | | | - $-0^{\circ}$ | | | [45] | - | - | | $\bullet$ | | | - | | | 人淄 | | | [49] | - | | | $\bullet$ | | | - | | | | | | [77] | - | | | - | | | - | | | | | | [85] | - | - | | - | - | | - | | - | | | | [86] | - | | | - | | | | - | | - | | | [73] | - | | | - | | | | - | - | | | | [87] | - | | | - | | | | | - | - | | | [50] | - | | | - | | | - | | | - | | | [74] | | | - | | | - | - | | | | | | [43] | - | | | - | | | - | | | - | | | [75] | - | - | | $\bullet$ | | | - | | | | | | [101] | - | | | - | | | - | | | | - | | [111] | - | | | - | | | - | | | - | | | [112] | | | - | | | | | | | | | | [78] [94] | - | 俉 | | - | $\bullet$ | | $\bullet$ | | | ![](https://cdn.mathpix.com/cropped/2025_01_12_16082c99ea41429dc8e8g-2.jpg?height=50&width=244&top_left_y=974&top_left_x=1555) | | | ![](https://cdn.mathpix.com/cropped/2025_01_12_16082c99ea41429dc8e8g-2.jpg?height=35&width=51&top_left_y=1013&top_left_x=144) | $\bullet$ | | | | $\bullet$ | | | ![](https://cdn.mathpix.com/cropped/2025_01_12_16082c99ea41429dc8e8g-2.jpg?height=35&width=114&top_left_y=1013&top_left_x=1163) | | $\bullet$ | | | | - | | | $\bullet$ | | | - | - | | - | | | [44] | - | | | - | | | | | | $\bullet$ | - | | [42] | $\bullet$ | | | $\bullet$ | | | | | | $\bullet$ | | | [39] | | - | | | - | | | | - | | | | [76] | | | - | | | $\bullet$ | $\bullet$ | | | | | | [40] | - | - | | | - | | | | | $\bullet$ | | | [6] | | - | | | - | | | | - | | | | [52] | - | | | - | | | | | | - | | | [53] | - | | | - | | | $\bullet$ | | | - | | | [46] | | | - | | | - | - | | | | | | [9] | - | | | - | | | - | | | - | - | | [8] | - | | | - | | | | | | - | | | [41] | - | | | - | | | | | | | - | | [80] | - | 人 | | - | | | $\bullet$ | $\bullet$ | | | | | [81] | - | | | - | | | - | - | | | | | [82] | - | | | - | | | - | - | | | | | [95] | - | | | - | | | - | | | | | | [54] | - | | - | - | | | | | - | | | | [88] | | | - | | - | | | - | | | | | [19] | - | - | | | - | | | | - | | | | [55] | | - | | | - | | | | - | | | | [56] | - | | | - | | | | | | - | | | [102] | - | | | - | | | $\bullet$ | | | | | | [113] | - | | | - | | | - | | | | | | [66] | - | | - | - | | | - | | | | | | [104] | - | | | - | | | - | | | | | | [67] | - | | | - | | , | $\bullet$ | | | Q | | | [57] | - | ![](https://cdn.mathpix.com/cropped/2025_01_12_16082c99ea41429dc8e8g-2.jpg?height=36&width=78&top_left_y=1863&top_left_x=402) | | - | | $0$ | $\bullet$ | | | ![](https://cdn.mathpix.com/cropped/2025_01_12_16082c99ea41429dc8e8g-2.jpg?height=36&width=63&top_left_y=1863&top_left_x=1736) | | | [58] | - | | | - | | | | | | - | | | [105] | $\bullet$ | | | - | | | | - | | | | | [89] | | - | | | - | | | - | | | | | [103] | - | | | $\bullet$ | | | | | | | | | [83] | - | | | $\bullet$ | | | - | | | | | | [90] | | | - | | - | | | | $\bullet$ | | | | [59] | - | | | $\bullet$ | | | - | | | | | | [68] | - | | | - | | | - | | | | | | [60] | - | | | - | | | | | | - | | | | 67 | 16 | 11 | 60 | 18 | 4 | 42 | 16 | 16 | 24 | 9 |

References  引用

[1]Kim K,Cho YK.Construction-specific spatial information reasoning in Building Information Models.Adv Eng Informatics 2015;29:1013-27.https://doi.org/ 10.1016/J.AEI.2015.08.004.
[1]Kim K,Cho YK。建筑信息模型中的特定于建筑的空间信息推理。Adv Eng Informatics 2015;29:1013-27.https://doi.org/ 10.1016/J.AEI.2015.08.004。

[2]ISO.ISO 19650-1:2018 Organization and digitization of information about buildings and civil engineering works,including building information modelling
[2]ISO 19650-1:2018建筑和土木工程信息的组织和数字化,包括建筑信息建模

(BIM)-Information management using building information modelling-Part 1:Concepts and principles. 2018.
建筑信息模型的信息管理第1部分:概念和原则2018.

[3]Boton C,Rivest L,Ghnaya O,Chouchen M.What is at the root of construction 4.0: a systematic review of the recent research effort.Arch Comput Methods Eng 2021;28:2331-50.https://doi.org/10.1007/s11831-020-09457-7.
[3]Boton C,Rivest L,Ghnaya O,Chouchen M。什么是构建4.0的根源:对最近研究成果的系统回顾。Arch Comput Methods Eng 2021;28:2331-50.https://doi.org/10.1007/s11831-020-09457-7。

[4]Succar B.Building information modelling framework:A research and delivery foundation for industry stakeholders.Autom Constr 2009;18:357-75.https://doi. org/10.1016/j.autcon.2008.10.003.
[4]Succar B。构建信息建模框架:行业利益相关者的研究和交付基础。Autom Constr 2009;18:357-75.https://doi。org/10.1016/j.autcon.2008.10.003。